Figure 58:
Screwing delivery sections together
Is only one side accessible (panels and connection frame) the tapping screws ø8 x 11 shall be
used, otherwise bolts and nuts (all supplied separately):
-
Screws M8 x 20 for connection angles and base frame
-
Screws M6 x 16 for connection frame and panels
For the tightness at least every second hole (bolt spacing 305mm) shall be used.
After placing all the screws loosely they shall be tightened - starting with the base frame
– in two
Figure 59:
Tightening the screws
Reinsert the insulation and remount the external panel
From the external panels of roof units, or units with external aluminum panels the white protective
film from the sealing tape must be removed before mounting (