Trane BAYAIR30AVENTA Скачать руководство пользователя страница 2

INSTALLER'S GUIDE

Pub. No. 18-CH34D1-7

Page 2

MAINTAIN 12 IN.

MINIMUM CLEARANCE

ABOVE HIGHEST

ANTICIPATED SNOW

LEVEL. MAXIMUM OF

24 IN. ABOVE ROOF.

VENT

COMBUSTION

AIR

REMOVE RIBS
FROM CAP

CONCENTRIC VENT 

ROOF TOP APPLICATION

CONCENTRIC VENT KIT ASSEMBLED

4.5" DIA

35.2" (typ.)

3" DIA PVC

VENT/EXHAUST

3" DIA PVC INTAKE/

    COMBUSTION AIR

MAY BE

LENGTHENED TO 60" MAXIMUM 
WITH 

FIELD REPLACEMENT 

PIPING.

  
DO NOT EXTEND MAIN BODY PIPES  
WITH PIPE COUPLINGS.

MAIN BODY PIPES

21.125" (typ)

INSTALLATION - ROOF TERMINATION  (SEE FIG. 3)
1.  Determine best location for termination kit.
2.  Cut one hole (5 in. diameter) for vent kit.

NOTE:  Ensure termination height is above the roof surface 

or anticipated snow level (1 ft. in USA or 1 1/2 ft. in Canada) 

as shown in Figure 4.

NOTE:  If assembly is too short to meet the height require-

ment, the two pipes supplied in the kit may be replaced by 

using same diameter, field supplied SDR-26 PVC (ASTM 

D2241) pipe.  Do not extend the 4" pipe (24" as shipped) to 

more than  60 in. (See Figure 2).

WARNING

!

DO NOT OPERATE THE FURNACE OR BOILER WITHOUT 

THE RAIN CAP IN PLACE AS RECIRCULATION OF COMBUS-

TION PRODUCTS MAY OCCUR. WATER MAY ALSO COLLECT 

INSIDE THE LARGER COMBUSTION AIR PIPE AND FLOW 

TO THE BURNER ENCLOSURE. FAILURE TO FOLLOW THIS 

WARNING COULD RESULT IN PRODUCT DAMAGE OR IM-

PROPER OPERATION, PERSONAL INJURY OR DEATH

CAUTION

!

DO NOT USE FIELD SUPPLIED COUPLINGS TO EXTEND 

MAIN BODY PIPES (4" AND 2-1/2" PIPES). AIRFLOW RE-

STRICTION WILL OCCUR AND THE FURNACE OR BOILER 

PRESSURE SWITCH MAY CAUSE INTERMITTENT OPERA-

TION.

3.  Partially assemble the vent kit.  Clean the pipe ends and  
 

adjoining sockets with PVC primer (ASTM F-656) and    

 

cement using PVC cement (ASTM D-256). 

 

a. Cement the Wye concentric fitting to larger diameter kit   

 

  pipe. (See Figure 1)

 

b. Cement the rain cap to smaller diameter kit pipe. (See  

 

  Figure 1)

NOTE:  Instead of cementing the smaller pipe to the rain cap, 

RTV silicon sealant may be used to permit future field disas-

sembly for cleaning

4.  Install Wye fitting and pipe assembly from the inside through 

structure's hole. Install field supplied roof boot/ flashing.

NOTE:  Do not allow insulation or other materials to accumu-

late inside pipe assembly when installing through hole.

5.  Secure assembly to roof structure as shown in Figure 4 using 

field supplied metal strapping or equivalent support material.

6.  Remove ribs from rain cap.  Install the rain cap and the 

small diameter pipe assembly in the Wye fitting and pipe 
assembly. Ensure that the small diameter pipe is cemented 
and bottomed into the Wye fitting.

WARNING

!

DRILL A PILOT HOLE IN THE VENT PIPE FOR THE SCREW 

SIZE BEING USED. FAILURE TO DRILL ADEQUATE HOLES 

MAY CAUSE CRACKING OF THE PVC COMPONENTS, AL-

LOWING FLUE GASES TO BE RECIRCULATED. FAILURE TO 

FOLLOW THIS WARNING COULD RESULT IN PROPERTY 

DAMAGE, PERSONAL INJURY OR DEATH.

2

3

7.  Cement the furnace or boiler combustion air and vent pipes 

to the concentric vent termination assembly.  See Figure 4 
for proper pipe attachment.

8.   CHECKOUT: Operate the furnace or boiler to make sure ALL 

pipe joints are fastened and sealed to prevent the escape of 
combustion products into the building.

NOTE:  Two or more installations require a minimum separa-

tion distance of approximately one inch between vent kits.

WARNING

!

FAILURE TO REMOVE RIBS FROM RAIN CAP FOR VERTI-

CAL VENT KIT INSTALLATIONS MAY CAUSE ICE OR SNOW 

TO FORM ON THE RAIN CAP, LEADING TO AN INOPERABLE 

FURNACE. FAILURE TO FOLLOW THIS WARNING COULD 

RESULT IN PROPERTY DAMAGE, PERSONAL INJURY OR 

DEATH.

NOTE:  Kit supplied stainless steel screw will be used to se-

cure the rain cap to the pipe.

Отзывы: