12
CLCH-SVX07C-EN
Pre-Installation Requirements
handling during shipping, in addition to other factors can cause pipe connections to become
loose.
Note:
Trane will not be responsible for any leak at the field connections. Coils have been factory
pressure tested before shipping.
Assembly Hardware
Trane air handlers ship with all necessary assembly hardware and gasket material. This hardware
is packaged in either a clear plastic envelope or cardboard box and can be found inside the fan,
mixing box, or access section. If there is not enough space inside the section, a crate or pallet will
be loaded onto the bed of the truck. Check the Parts List on the Field Assembly drawing against the
contents of the crate. Do not proceed with unit assembly until verification that all materials are
present. Sometimes it is necessary to use more than one section to ship hardware. Please check
all sections thoroughly before contacting your local Trane sales engineer to report missing
hardware.
Resolving Shipping Damage
Trane air handlers ship freight-on-board (FOB), meaning that the unit belongs to the customer the
moment the delivery truck leaves the factory. If damage has occurred to the unit during shipment,
follow these instructions:
Note:
Trane is not responsible for shipping damage.
1.
Make specific notation, describing the damage, on the freight bill. Take photos of the damaged
material if possible.
2. Report all claims of shipping damage to the delivering carrier immediately and coordinate
carrier inspection if necessary.
Note:
Do not attempt to repair the unit without consulting the delivering carrier.
3. Notify your Trane sales representative of the damage and arrange for repair.
Note:
Do not attempt to repair the unit without consulting the Trane sales representative.
4. Keep the damaged material in the same location as it was received.
Note:
It is the receiver's responsibility to provide reasonable evidence that concealed damage was
not incurred after delivery.
Storage Recommendations
NOTICE:
Corrosion!
All factory shipping protection should be removed. This wrapping is for transit protection only
and should not be used for jobsite storage.Use only canvas tarps to cover air handlers. Plastic
tarps can cause condensation to form in and on the equipment, which could result in corrosion
damage or wet storage stains.
Indoor air handlers and/or field-installed accessories that must be stored for a period of time before
installation must be protected from the elements. A controlled indoor environment is
recommended for proper storage.
Outdoor air handlers require no special protection for storage before installation. Keep the
equipment in the original container for protection and ease of handling.
Note:
The warranty does not cover damage to the unit or controls due to negligence during
storage.
Содержание AM4A0A18S11SA Series
Страница 1: ......
Страница 2: ......
Страница 3: ......
Страница 4: ......
Страница 100: ...96 CLCH SVX07C EN Installation Electrical Figure 84 Typical VFD wiring schematic ...
Страница 101: ...CLCH SVX07C EN 97 Installation Electrical Figure 85 Typical starter wiring schematic ...
Страница 135: ...CLCH SVX07C EN 131 Notes ...
Страница 146: ...10 1 2 STEP 8 Lift the Coil section up and away from the Blower section Set aside ...
Страница 178: ......
Страница 188: ...2 ...
Страница 189: ...3 ...
Страница 190: ...4 ...
Страница 198: ...w w w p r i c e h v a c c o m 6 SDV5000 c w direct digital controls SERVICE INSTALLATION MANUAL Notes ...
Страница 199: ...SDV5000 c w direct digital controls SERVICE INSTALLATION MANUAL w w w p r i c e h v a c c o m 7 ...
Страница 201: ......
Страница 202: ......
Страница 203: ......
Страница 204: ......
Страница 205: ......
Страница 206: ......
Страница 207: ......
Страница 208: ......
Страница 209: ......
Страница 210: ......
Страница 211: ......
Страница 212: ......
Страница 213: ......
Страница 214: ......
Страница 215: ......
Страница 216: ......
Страница 250: ......
Страница 251: ......