5.3 Required Refrigerant Line Length
5.2 Factory Charge
5.4 Refrigerant Line Insulation
Important:
The Vapor Line must always be
insulated. DO NOT allow the Liquid Line and
Vapor Line to come in direct (metal to metal)
contact.
Vapor Line
Liquid Line
Insulation
Determine required line length and lift. You will
need this later in STEP 2 of Section 14.
Total Line Length = __________ Ft.
Total Vertical Change (lift) = __________ Ft.
The outdoor condensing units are factory charged with the system charge required for the outdoor condensing
unit, ten (10) feet of tested connecting line, and the smallest rated indoor evaporative coil match. Always verify
proper system charge via subcooling (TXV/EEV) or superheat (fixed orifice) per the unit nameplate.
Line Length
Содержание 4TTX7
Страница 25: ...18 AC125D1 1A EN 25 Section 17 Wiring Diagrams 2 3 Ton Units...
Страница 26: ...26 18 AC125D1 1A EN PRINTED FROM D157615P04 REV A 2 3 Ton Units...
Страница 27: ...18 AC125D1 1A EN 27 4 Ton Units...
Страница 28: ...28 18 AC125D1 1A EN 4 Ton Units...
Страница 29: ...18 AC125D1 1A EN 29 5 Ton Units...
Страница 30: ...30 18 AC125D1 1A EN 5 Ton Units...