Optional Control and Output Circuits
Install various optional wiring as required by the owner’s
specifications. Refer to
Optional Tracer Communication Interface
This control option allows the control panel to exchange
information such as chiller status and operating set
points with a Tracer system.
Note:
The circuit must be run in separate conduit to
prevent electrical noise interference.
Additional information about the Tracer Comm option is
published in the installation and operator’s guide that
ships with the Tracer.
Unit Start-Up
All phases of initial unit start-up must be conducted un-
der the supervision of a qualified Trane technician. This
includes pressure testing, evacuation, electrical checks,
refrigerant charging, actual start-up and operator instruc-
tion. Advance notification is required to assure that initial
start- up is scheduled as close to the requested date as
possible.
Starter Module Configuration
The starter module configuration settings will be checked
(and configured for Remote Starters) during start-up
commissioning. To configure starter modules, and per-
form other starter checks, it is recommended that the line
voltage three phase power be turned off and secured
(locked out), and then a separate source control power
(115 Vac) be utilized to power up the control circuits. To
do this, remove control coil circuit fuse, typically 2F4,
and connect separate source power cord to starter termi-
nal block 120 V source connect, and ground.
Use the as-built starter schematic to assure correct fuse
and terminals. Verify correct fuse is removed, control
circuit connections are correct, then apply the 115 Vac
separate source power to service the controls.
Schematic Wiring Drawings
The chart below consist of typical wiring drawings for a
CenTraVac chiller available through e-Library. However,
please refer to the submittals and drawings that actually
shipped with the unit. Additional wiring drawings for
CenTraVac chillers are available from your local Trane
office.
Field Wiring Layout Drawing
Drawing Number
Maximum Acceleration Time
(seconds)
Unit Mounted Wye-Delta Starter (USTR)
2311-0801
27
Unit Mounted Solid-State Starter (USID)
2311-0831
15
Unit Mounted Across-the-Line (UXL)
2311-0834
6
Unit Mounted Adaptive Frequency Drive (UAFD)
2311-0810 &
2311-0811
30
Unit Mounted Auto Transformer Start (UATR)
2311-0832
11
Unit Mounted Primary Transformer (UPIR)
2311-0833
11
Remote Wye-Delta Starter (RSTR)
2311-0802
27
Remote Mounted Solid-State Starter (FSID, WSID)
2311-0804
15
Remote Across-the-Line Starter (RXL)
2311-0808
6
Remote Primary Reactor Starter (RPIR)
2311-0807
11
Remote Auto Transformer Starter (RATR
2311-0806
11
Customer Supplied Wye-Delta Starter (CSTR)
2311-0457
27
Customer Supplied Primary Reactor or Auto Transformer Starter
(CATR, CPIR)
2311-0479
11
Customer Supplied Across-the-Line Starter (CXL)
2311-0493
6
Customer Supplied Solid-State Starter (CSOL)
2311-0461
20
Purge Schematic
2311-0816
Unit Controls Schematic
2311-0810
System Controls Schematic
2311-0814
Optional Control Schematic
2311-0817
Connection Diagrams
Standard Connection Diagram Panel with Options
2311-0819
Field Connection Trane Starter (LV)
2311-0822
Unit Wiring
2311-0824
Notes:
1. These are typical drawings only. Refer to specific as-built schematics for actual unit drawings which represent the unit wiring as shipped.
2. Contact your local Trane representative for all other schematics, wiring diagrams and/or connection diagrams not listed.