102
CVHE-SVX005B-EN
Appendix C: CenTraVac
™
™
Chiller Start-up Tasks to be
Performed by Trane
W
WA
AR
RN
NIIN
NG
G
S
Sa
affe
etty
y A
Alle
errtt!!
F
Fa
aiillu
urre
e tto
o ffo
ollllo
ow
w iin
nssttrru
uccttiio
on
nss b
be
ello
ow
w cco
ou
ulld
d rre
essu
ulltt iin
n
d
de
ea
atth
h o
orr sse
erriio
ou
uss iin
njju
urry
y..
IIn
n a
ad
dd
diittiio
on
n tto
o tth
he
e ffo
ollllo
ow
wiin
ng
g tta
asskkss,, y
yo
ou
u M
MU
US
ST
T::
••
F
Fo
ollllo
ow
w a
allll iin
nssttrru
uccttiio
on
nss iin
n tth
he
e u
un
niitt’’ss
IIn
nsstta
alllla
attiio
on
n,, O
Op
pe
erra
attiio
on
n,, a
an
nd
d M
Ma
aiin
ntte
en
na
an
ncce
e
m
ma
an
nu
ua
all,, iin
nccllu
ud
diin
ng
g w
wa
arrn
niin
ng
gss,, cca
au
uttiio
on
nss,, a
an
nd
d
n
no
ottiicce
ess..
••
P
Pe
errffo
orrm
m a
allll rre
eq
qu
uiirre
ed
d tta
asskkss iin
n a
an
ny
y a
ap
pp
plliicca
ab
blle
e
S
Se
errv
viicce
e A
Alle
errttss a
an
nd
d S
Se
errv
viicce
e B
Bu
ulllle
ettiin
nss..
••
R
Re
ev
viie
ew
w a
an
nd
d u
un
nd
de
errsstta
an
nd
d a
allll iin
nffo
orrm
ma
attiio
on
n
p
prro
ov
viid
de
ed
d iin
n S
Su
ub
bm
miitttta
allss a
an
nd
d D
De
essiig
gn
n
S
Sp
pe
ecciiffiicca
attiio
on
nss..
1. G
Ge
en
ne
erra
all
☐
Inspect chiller for damage (shipping or rigging).
☐
Verify and record unit nitrogen holding charge
pressure.
☐
Inspect water piping for proper installation.
☐
Inspect strainers, flow sensing devices,
isolation valves, pressure gauges,
thermometer wells, flow balancing valves,
vent cocks, and drains.
☐
Inspect cooling tower piping.
☐
Verify proper clearances.
☐
Power wiring meets size requirement.
☐
Verify proper voltage and amperage rating.
☐
Verify proper foundation installation.
☐
Verify unit isolator pads/springs have been
installed.
☐
Verify low voltage circuits are isolated from high
voltage circuits.
☐
Check equipment room for ventilation,
refrigerant monitor, rupture disk piping, and
Personal Protective Equipment (PPE).
N
No
otte
e:: All conditions which do not conform to the
established requirements for unit installation
MUST be corrected prior to start-up. Any non-
conforming condition which is not corrected
prior to start-up must be noted in the
Non-
Compliance Form
(PROD-ADF001*-EN) by the
start-up technician; this information must also be
signed by responsible site personnel before
start-up and the completed
Non-Compliance
Form
will become part of the start-up record,
submitted with a
Start-up Check Sheet
and a
Chiller Service Report
.
2. P
Prre
e--S
Stta
arrtt O
Op
pe
erra
attiio
on
nss
☐
Verify nitrogen holding charge.
☐
Calibrate the high pressure cutout control
(HPC).
☐
Meg compressor motor.
☐
Confirm proper oil pump operation.
☐
Evacuate unit.
☐
Check condenser installation.
☐
Check evaporator installation.
N
NO
OT
TIIC
CE
E
D
Do
o N
No
ott A
Ap
pp
plly
y E
Elle
eccttrriicca
all P
Po
ow
we
err tto
o
a
a U
Un
niitt iin
n a
a V
Va
accu
uu
um
m!!
F
Fa
aiillu
urre
e tto
o ffo
ollllo
ow
w iin
nssttrru
uccttiio
on
nss b
be
ello
ow
w cco
ou
ulld
d
rre
essu
ulltt iin
n m
mo
otto
orr a
an
nd
d cco
om
mp
prre
esssso
orr d
da
am
ma
ag
ge
e..
D
Do
o n
no
ott a
ap
pp
plly
y e
elle
eccttrriicca
all p
po
ow
we
err tto
o a
a m
mo
otto
orr iin
n a
a
v
va
accu
uu
um
m..
F
Fo
orr u
un
niittss w
wiitth
h iin
nssiid
de
e--tth
he
e--d
de
elltta
a sso
olliid
d sstta
atte
e
sstta
arrtte
errss,, d
diisscco
on
nn
ne
ecctt p
po
ow
we
err tto
o u
un
niitt d
du
urriin
ng
g
e
ev
va
accu
ua
attiio
on
n o
orr w
wh
he
en
n tth
he
e u
un
niitt iiss iin
n a
a d
de
ee
ep
p
v
va
accu
uu
um
m.. IIn
n a
ad
dd
diittiio
on
n,, o
on
n u
un
niittss w
wiitth
h iin
nssiid
de
e--
tth
he
e--d
de
elltta
a sso
olliid
d sstta
atte
e sstta
arrtte
errss,, a
allll p
po
ow
we
err tto
o
tth
he
e u
un
niitt m
mu
usstt b
be
e d
diisscco
on
nn
ne
ecctte
ed
d p
prriio
orr tto
o
e
ev
va
accu
ua
attiin
ng
g tth
he
e u
un
niitt a
ass lliin
ne
e p
po
ow
we
err iiss d
diirre
eccttlly
y
a
ap
pp
plliie
ed
d tto
o tth
he
e m
mo
otto
orr tte
errm
miin
na
allss 4
4,, 5
5,, a
an
nd
d 6
6..
☐
Check electrical and controls.
☐
Inspect motor starter and control panel.
☐
Confirm all wiring connections are tight, free
of abrasion and have no sharp bends in
panel and on compressors.
☐
Inspect contactors and relays.
☐
Verify unit wiring (low and high voltage) is
correctly isolated, phased, and properly
grounded.
☐
Connect external 120 Vac power to power up
the control panel.