background image

TRAK Machine Tools

 

Site Preparation Guide 
TRAK VMC14si  

                                                                                                                                           

F16467-65 | Rev 9/10/2021 

Page 1 of 7 

B

efore an Authorized Field Service Technician can perform the machine’s final chec

kout, the following requirements must 

be met:

 

 

The machine must be in position and placed on its rest 
pads. 

 

Please make sure to use a large enough forklift when 
lifting the VMCsi machine. When removing the machine 
from the pallet, please note that the center of gravity 

(CG) of the machine is ~79

” from

 the edge of the 

enclosure sheet metal. See figure 4.     

 

The VMCsi must be lifted from either the left- or right-
hand sides. Make certain that the forks are squarely in 
the lifting cutouts beneath the machine. See the figures 
below. 

 

The VMCsi may be lifted via a crane with 4 points shown 
in figure 7 and 8.   

 

 

Once the machine is raised from the pallet, thread the 
adjusting screws into the bed casting. Thread the leveling 

screws down approximately 1.25” as measured from the 

bottom of the leveling bolt to the bottom of the casting. 
The VMCsi should be placed on the 4 leveling pads labeled 

L1, R1, L4 and R4. See figure 6. The remaining leveling 
screws should be threaded in but not touching the pad. 
They will be adjusted during installation.  

 

The machine must be wired (refer to the installation and 
service manual for additional information). Make sure to 
follow our grounding recommendations.   

 

The machine must have air hooked up. We strongly 

recommend that a water separator or air dryer be installed 
upstream of the VMCsi air supply. 

Space & Weight 

 

Floor area (W x L) = 226.25

” x 

157

 

 

Height = 106

” (min) / 

119.25

” (max)

 

 

Footprint (W x L) (coolant tank in place) = 180

 x 

126.50

 

 

Net (approx.) Weight = 17,600 lbs. 

 

Shipping (approx.) Weight = 18,100 lbs. 

 

Pallet Size = 91

” x 1

63

 

 

The floor area encompasses the space required to 

position the chip container and have the electrical 
cabinet or side doors open along the X axis. 

 

A solid and level foundation to maintain approximately 

17,600 lbs. plus the weight of the workpiece (maximum 
total of ~ 20,250 lbs.) is required. Ten leveling screws 
are provided. 

 

Minimum doorway width is 158

” and

 minimum height is 

98.75” that the VMCsi ca

n fit through (assumes Z axis 

motor removed). The 98.75” height dimension can be 
reduced to ~96.75” if further items are removed. (Must 

remove ATC motors and rear channel sheet metal on 
rear of column.) 

Electrical 

 

A separate 480 VAC (432 to 528 V is acceptable), 69 amps, 
60 Hz, 3 phase circuit is required.   

 

Machine tool should be earth grounded with a dedicated 8-
foot long copper rod. The 6-gage ground wire should run 

from the copper rod to grounding location in the electrical 
cabinet. See figures 9 and 10.     

Air  

 

½” ID minimum air connection is required.

 

 

Air pressure must be a minimum of 90 psi. 

 

Air 

 3.0 CFM (at 90 psi), 25 SCFM

 

 
 
 

 

 

Содержание VMC14si

Страница 1: ...ion and service manual for additional information Make sure to follow our grounding recommendations The machine must have air hooked up We strongly recommend that a water separator or air dryer be installed upstream of the VMCsi air supply Space Weight Floor area W x L 226 25 x 157 Height 106 min 119 25 max Footprint W x L coolant tank in place 180 x 126 50 Net approx Weight 17 600 lbs Shipping ap...

Страница 2: ...TRAK Machine Tools Site Preparation Guide TRAK VMC14si F16467 65 Rev 9 10 2021 Page 2 of 7 Figure 1 Front View of Machine Figure 2 Side View of Machine ...

Страница 3: ...TRAK Machine Tools Site Preparation Guide TRAK VMC14si F16467 65 Rev 9 10 2021 Page 3 of 7 Figure 3 Top View of Machine Figure 4 Lifting the VMCsi ...

Страница 4: ...TRAK Machine Tools Site Preparation Guide TRAK VMC14si F16467 65 Rev 9 10 2021 Page 4 of 7 Figure 5 Lifting the VMCsi Figure 6 Leveling Pad Locations ...

Страница 5: ...of 7 If you would like to lift the machine with a crane the following figures show the lifting points Note Brackets that attach to the two column casting and shown in figure 8 are not provided with the machine Figure 7 Lifting Machine with Straps Figure 8 Lifting Machine on Top of Column ...

Страница 6: ... the figure 10 Figure 9 Connect the Ground Wire Machine Grounding It is strongly recommended that the machine be earth grounded A dedicated copper rod 8 feet or so in length should be driven into the ground near the VMCsi A ground wire should then be run from the location shown in figure 9 The copper wire should exit the electrical cabinet in the mid left hand side as shown in figure 10 Make sure ...

Страница 7: ...TRAK Machine Tools Site Preparation Guide TRAK VMC14si F16467 65 Rev 9 10 2021 Page 7 of 7 Figure 10 Exit Location for Ground Wire to Copper Rod ...

Отзывы: