F16467-62 | Rev 8/3/2021
Page 2 of 7
Figure 1
–
Front View of Machine
Figure 2
Side View of Machine
Страница 1: ...commend that a water separator or air dryer be installed upstream of the VMCsi air supply Space Weight Floor area W x L 177 x 128 25 Height 93 5 min 108 max Footprint W x L coolant tank in place 144 x...
Страница 2: ...TRAK Machine Tools Site Preparation Guide TRAK VMC7si F16467 62 Rev 8 3 2021 Page 2 of 7 Figure 1 Front View of Machine Figure 2 Side View of Machine...
Страница 3: ...TRAK Machine Tools Site Preparation Guide TRAK VMC7si F16467 62 Rev 8 3 2021 Page 3 of 7 Figure 3 Top View of Machine Figure 4 Lifting the VMCsi...
Страница 4: ...TRAK Machine Tools Site Preparation Guide TRAK VMC7si F16467 62 Rev 8 3 2021 Page 4 of 7 Figure 5 Lifting the VMCsi Figure 6 Leveling Pad Locations...
Страница 5: ...7 If you would like to lift the machine with a crane the following figures show the lifting points Note Brackets that attach to the two column casting and shown in figure 8 are not provided with the...
Страница 6: ...wire as shown in the figure 10 Figure 9 Connect the Ground Wire Machine Grounding It is strongly recommended that the machine be earth grounded A dedicated copper rod 8 feet or so in length should be...
Страница 7: ...TRAK Machine Tools Site Preparation Guide TRAK VMC7si F16467 62 Rev 8 3 2021 Page 7 of 7 Figure 10 Exit Location for Ground Wire to Copper Rod...