TRAK Machine Tools
Site Preparation Guide
TRAK TMC7
F16467-54 | Rev 2/18/2022
Page 6 of 7
Electrical Connections
Main Power to the Machine Connections
The 3 phase 208 voltage (200
–
240 V is acceptable) is connected to L1, L2 and L3 at the main power switch inside
the electrical box. Connect the ground wire as shown in the figure 9.
Figure 9
–
Connect the Ground Wire
Machine Grounding
It is strongly recommended that the machine be earth grounded. A dedicated copper rod 8 feet or so in length
should be driven into the ground near the TMC. A ground wire should then be run from the location shown in figure
9. The copper wire should exit the electrical cabinet in the lower right-hand corner as shown in figure 10. Make sure
the foam where the copper wire goes through seals the cabinet from external debris. The wire should be 6 gage in
size.