Traditions T150C Скачать руководство пользователя страница 11

INSTALLATION   Combustible Wall Chimney Connector Pass-Throughs

NOTES:
1. 

Connectors to a masonry chimney, excepting method B, shall extend in one continuous section through the wall pass-through system
and the chimney wall, to but not past the inner flue liner face.

2. 

A chimney connector shall not pass through an attic or roof space, closet or similar concealed space, or a floor, or ceiling.

3. 

Where passage through a wall, or partition of combustible construction is desired, the installation shall conform to CAN/CSA-B365.

PAGE 11

Note:

Connectors to a masonry chimney, excepting

method B, shall extend in one continuous section
through the wall pass-through system and the chimney
wall, to but not past the inner flue liner face.

Method A. 12 inch (305 mm) Clearance to Combustible

Wall Member: Using a minimum thickness 3.5 inch (90

mm) brick and a 5/8 inch (16 mm) minimum wall thickness

clay liner, construct a wall pass-through.  The clay liner

must conform to ASTM C315 (Standard Specification for

Clay Fire Linings) or its equivalent. Keep a minimum of 12

inches (305 mm) of brick masonry between the clay liner

and wall combustibles.  The clay liner shall run from the

brick masonry outer surface to the inner surface of the

chimney flue liner but not past the inner surface.  Firmly

grout or cement the clay liner in place to the chimney flue

liner.

Method B. 9 inch (229 mm) Clearance to Combustible Wall

Member: Using a 6 inch (152 mm) inside diameter, listed,

factory-built Solid-Pak chimney section with insulation of 1

inch (25.4 mm) or more, build a wall pass-through with a

minimum 9 inch air space between the outer wall of the

chimney length and wall combustibles.  Use sheet metal

supports fastened securely to wall surfaces on all sides, to

maintain the 9-inch (229 mm) air space.  When fastening

supports to chimney length, do not penetrate the chimney

liner (the inside wall of the Solid-Pak chimney).  The inner

end of the Solid-Pak chimney section shall be flush with

the inside of the masonry chimney flue, and sealed with a

non-water soluble refractory cement.  Use this cement to

also seal to the brick masonry penetration.

Method C. 6 inch (152 mm) Clearance to Combustible Wall

Member: Starting with a minimum 24 gage (.024 inch [.61

mm]) 6-inch (152 mm) metal chimney connector, and a

minimum 24 gage ventilated wall thimble which has two air

channels of 1 inch (25.4 mm) each, construct a wall pass-

through. There shall be a minimum 6 inch (152 mm) sepa-

ration area containing fiber glass insulation, from the outer

surface of the wall thimble to wall combustibles.  Support

the wall thimble, and cover its opening with a 24-gage

minimum sheet metal support. Maintain the 6-inch (152

mm) space.  There should also be a support sized to fit

and hold the metal chimney connector. See that the sup-

ports are fastened securely to wall surfaces on all sides.

Make sure fasteners used to secure the metal chimney

connector do not penetrate chimney flue liner.

Method D.  2 inch (51 mm) Clearance to Combustible Wall

Member:

 

Start with a solid-pak listed factory built chimney

section at least 12 inches (305mm) long, with insulation of

1 inch (25.4mm) or more, and an inside diameter of 8

inches (2 inches [51 mm] larger than the 6 inch [152 mm]

chimney connector). Use this as a pass-through for a

minimum 24-gage single wall steel chimney connector.

Keep solid-pak section concentric with and spaced 1 inch

(25.4 mm) off the chimney connector by way of sheet

metal support plates at both ends of chimney section.

Cover opening with and support chimney section on both

sides with 24 gage minimum sheet metal supports. See

that the supports are fastened securely to wall surfaces on

all sides. Make sure fasteners used to secure chimney

section do not penetrate chimney flue liner.

D

C

B

A

f i r e - p a r t s . c o m

Содержание T150C

Страница 1: ...THIS APPLIANCE MUST BE INSTALLED BY A QUALIFIED TECHNICIAN READ MANUAL THOROUGHLY BEFORE INSTALLATION RETAIN THESE INSTRUCTIONS FOR FUTURE REFERENCE INSTALLATION AND OPERATION MANUAL Ce manuel d inst...

Страница 2: ...ABLE FLUIDS SUCH AS GASOLINE NAPHTHA OR ENGINE OIL 9 Never use gasoline gasoline type lantern fuel kerosene charcoal lighter fluid or similar liq uids to start or freshen up a fire in this heater Keep...

Страница 3: ...rble is used Place pad under top marble and strips under ash lip marble USING THIS MANUAL Please read and carefully follow all of the instructions found in this manual Please pay special attention to...

Страница 4: ...IONS THIS APPLIANCE IS EQUIPPED WITH A THREE PRONG GROUNDING PLUG FOR YOUR PROTEC TION AGAINST SHOCK HAZARD AND SHOULD BE PLUGGED DIRECTLY INTO A PROPERLY GROUNDED THREE PRONG RE CEPTACLE DO NOT CUT O...

Страница 5: ...used In some cases if the k value is less or the r value higher a thinner material may be used Methods of determining floor protection equivalents To determine the thickness required for any material...

Страница 6: ...A CHIMNEY SYS TEM SERVING ANOTHER STOVE APPLIANCE OR ANY AIR DISTRIBUTION DUCT FAILURE TO FOL LOW THESE INSTRUCTIONS WILL VOID THE MANUFACTURERS WARRANTY If you plan to vent your stove into an existi...

Страница 7: ...nd air transfer Other appliances in the dwelling also contribute to re moving air from the dwelling i e clothes dryers exhaust fans fireplaces and other fuel burning appliances If the available fresh...

Страница 8: ...ion To A Factory Built Chimney This space heater is to be connected to a factory built chimney con forming to CAN ULC S629 Standard for 650 C Fac tory Built Chimneys For Reduced Residential Clearances...

Страница 9: ...on byproducts from the ap pliance If the venting system s design does not promote these ends the system may not function properly Poorly functioning venting systems may create performance problems as...

Страница 10: ...INSTALLATION PAGE 10 RESIDENTIAL INSTALLATION DIAGRAM fire parts com...

Страница 11: ...stening supports to chimney length do not penetrate the chimney liner the inside wall of the Solid Pak chimney The inner end of the Solid Pak chimney section shall be flush with the inside of the maso...

Страница 12: ...a conventional stove The catalytic combustor is designed to make use of this en ergy converting it into useful heat as it lessens chimney creosote build up and air pollution The catalytic com bustor c...

Страница 13: ...tion air located above the fuel door Slide the control to the right for a slower burn rate to the left for a higher burn rate It may take a while to get accustomed to the sensitive draft control Small...

Страница 14: ...s The high firing rate will ensure that the stove the flue the catalyst and the fuel are all stabilized at proper operating temperatures If the optional temperature probe is used even though it may re...

Страница 15: ...Ensure blower is turned off during start up and refueling as it will af fect the accuracy of temperature probe reading If the stove has been burning on a medium to high burn rate for approximately 20...

Страница 16: ...that produces heat from a woodstove is the wood It needs to be well seasoned natural wood What does Well Seasoned mean When a tree is cut down the wood is green full of sap and moisture This moisture...

Страница 17: ...d the side windows have a 1 8 3 2 mm thick lytherm gasket Should these gaskets become frayed or damaged they should be replaced with the same size and type as the original gasket Contact your dealer f...

Страница 18: ...ovincial fire authority for information on how to handle a chimney fire Have a clearly understood plan for handling a chimney fire CATALYST REPLACEMENT The normal expected life of a catalyst catalytic...

Страница 19: ...ed is sufficient for most users Reinstall the combustor set according to the following instructions 1 Disconnect pipe from stove flue outlet 2 Looking down into stove flue remove the bypass operating...

Страница 20: ...as long or as well as seasoned hardwood resulting in a short burn time 1 Wood size too small Burns at too rapid a rate 2 The gasket seal on the fuel door or glass is leaking air Repair or replace it...

Страница 21: ...required flow of combustion air to the fire chamber and for safely re moving unwanted combustion byproducts from the appli ance If the venting system s design does not promote these ends the system m...

Страница 22: ...r Size 6 152 mm Approx Burn Time 8 12 hours Fuel Capacity 55 lbs 25 kg Loading Front Catalyst Standard Width 27 686 mm Depth 22 5 572 mm Height to flue 29 737 mm Height 26 5 673 mm Approx Weight With...

Страница 23: ...Assembly 6 Also requires 28M09 Gasket Kit 26M78 Top Cast Stove Heat Shield Parts 29108 Shield Bottom Heat 29110 Shield Rear Heat Firebox Parts See Brick Diagram For Brick Part Number Z SC 103 Combusto...

Страница 24: ...COMPONENT DIAGRAMS T150C PAGE 24 FIREBRICK 1 thick Part Qty Dimensions FB 1 9 9 x 4 Regular Top View Showing Brick Installed CATALYTIC COMBUSTOR System Components fire parts com...

Страница 25: ...PK B Touch up Spray Paint Kit Black 12 oz Spray Can Blower Kit BK T15 A Blower Kit includes rheostat for variable speed control is available for increased heat circulation Blower Variable Speed Contro...

Страница 26: ...SAFETY LISTING LABEL PAGE 26 fire parts com...

Страница 27: ...EPA LABEL Page 27 fire parts com...

Страница 28: ...RSHIP RECORDS Dealer s Name Dealer s Address City State Zip Code Serial Number Date of Purchase Date Installed Notes SERVICE AND MAINTENANCE LOG Service Service Service Date Technician Description fir...

Страница 29: ...1110 West Taft Avenue Orange CA 92865 fire parts com...

Отзывы: