Trademaster RF 270S Скачать руководство пользователя страница 7

 

 

 

6

B            Fig. B 

   then repeat the running test. 
 6. 

Keep

 machine always out from sun, dust, wet, or raining area.   

 
 
5-3.Installation:

 

(1)

 

Always

 Keep proper footing & balance while moving this 208kgs machine. And 

only use heavy-duty fiber belt to lift the machine as per Fig. (B).

 

(2)

 

Hang the machine up, away from the floor, take away the 4 pads and assemble 
them on the auxiliary stand. Fix the machine on the auxiliary stand and lock the 
connection nut. 

(3)

 

Finish

 removing this wooden case/crate from the machine. Unbolt the machine 

from the crate bottom. 

(4)

 

Position 

& tighten 4 bolts into base holes properly after machine in balance. 

(5)

 

Turn off

 the power before wiring & be sure machine is in proper grounding. 

Overload & circuit breaker is recommended for safety wiring. 

(6)

 

Keep

 machine always out from sun, dust, wet, raining area. 

 
5-4.CLEAIG & LURICATING 

(1) Your machine has been coated with a heavy grease to protect it in shipping. This coating should be completely 

removed before operating the machine. Commercial degreaser, kerosene or similar solvent may be used to 
remove the grease from the machine, but avoid getting solvent on belts or other rubber parts. 

(2) After cleaning, coat all bright work with a light lubricant. Lubricate all points . with a medium consistency 

machine oil. 

6.MINIMUM ROOM SPACE FOR MACHINE OPERATION 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

82.5 ” 

133 ” 

97.5 ” 

Содержание RF 270S

Страница 1: ...METAL CUTTING BAND SAW MACHINE MODEL 270S INSTRUCTION MANUAL 050110 R0...

Страница 2: ...achine Operation 7 Make Proper Tooth Selection 8 BI Metal Speeds And Feeds 9 Use Of Main Machine Parts 10 Maintaining 11 Trouble shooting 12 Circuit Diagram 13 Parts Lists Drawing CAUTION Install saw...

Страница 3: ...Aspect Saw arm Control Panel The blade tension handle Motor The start button Coolant pump Base Angle Sale Move Vise The vise fixed handle The move vise handle The swivel vise base of handle Vise base...

Страница 4: ...or is being mounted connected or reconnected 8 ALWAYS keep hands and fingers away from the blade 9 STOP the machine before removing chips 10 SHUT OFF power and clean the BAND SAW and work area before...

Страница 5: ...de tension after initial cut with a new blade 6 TO RPOLONG BLADE LIFE ALWAYS release blade tension at the end of each workday 7 CHECK COOLANT DAILY Low coolant level can cause foaming and high blade t...

Страница 6: ...erage blade cover conforms to CE stipulation Well coolant fluid collection system provides clean and dry and safety of the working area 9 Chip pan underneath the working table prevents coolant fluid l...

Страница 7: ...olts into base holes properly after machine in balance 5 Turn off the power before wiring be sure machine is in proper grounding Overload circuit breaker is recommended for safety wiring 6 Keep machin...

Страница 8: ...he chart Select the tooth Ditch on the ring marked with the tubing and structural shape which aligns with the average width you are cutting EXAMPLE 4 100mm outside diameter 3 75mm inside diameter tubi...

Страница 9: ...230 volt single phase or 400 volt 3 phase magnetic control Before connecting your machine to an electrical power system be sure the motor shaft is running in the correct direction We recommend that 1...

Страница 10: ...e back of the blade is just lightly touching the wheel flanges of both wheels while the machine is running 9 5 ADJUSTING CUTTING WIDTH First loosen screw A fig 2 Move the left blade guide bar to the s...

Страница 11: ...a 90 degree position completely opened Remove work piece CONTINUED CUTTING When you need to cut a work piece many times just raise the vise handle A to loosen and adjust work piece position Then push...

Страница 12: ...accurate performance c Keep work area clean release vise cutter work piece from table switch off power source take chip or dust away from machine and follow instructions lubrication or coating rust p...

Страница 13: ...nual 3 Tighten Teeth Ripping from Blade 1 Tooth too coarse for work 2 Too heavy pressure too slow speed 3 Vibrating work piece 4 Gullets loading 1 Use finer tooth blade 2 Decrease pressure increase sp...

Страница 14: ...up after pushing the raising button 1 Improper setting of depth gauge 1 Press the emergency stop Button and RESET 2 Check the upper limit switch and stop round Position Make sure the limit switc is al...

Страница 15: ...14 12 CIRCUIT DIAGRA...

Страница 16: ......

Страница 17: ......

Страница 18: ......

Страница 19: ......

Страница 20: ......

Страница 21: ......

Страница 22: ......

Страница 23: ......

Страница 24: ......

Отзывы: