43
9. VEHCLE BRESK-IN PERIOD
The break-in period for your new ATV is defined as the first
50 hours of operation.
No single action on your part is as
important as a proper break in period. Careful treatment of new
engine will result in more efficient performance and longer life for
the engine. Perform the following procedures carefully.
CAUTION
do not operate at full throttle or high speeds for extended periods
during the break-in period. Excessive heat can build up and
cause damage to close fitted engine parts.
Please set a limit to
half throttle during
the break-in periods.
1. Locknut
2. Adjuster
1. Fill fuel tank.
2. Check oil reservoir level indicated on dipstick. Add oil if
necessary.
3. Drive slowly at first. Select an area which is open and will give
you room to familiarize yourself with vehicle operation and
handling.
4. Vary the throttle positions. Do not operate at sustained idle.
5. Perform regular checks on fluid levels, controls and all
important areas on the vehicle as outlined earlier on the daily
pre-ride inspection checklist found in ”
4.daily pre-ride
inspection
”.
6. Don’t pull loads.
7. After the first 2 hours of operation, and before and after each
use, lubricate the chain and check the tension adjustment.
Содержание M150
Страница 10: ...10 3 SAFETY WARNING 1 6 ...
Страница 11: ...11 3 SAFETY WARNING 2 3 ...
Страница 12: ...12 3 SAFETY WARNING 4 5 ...
Страница 13: ...13 3 SAFETY WARNING 7 8 ...
Страница 68: ...68 ...
Страница 99: ...99 17 Tool ...
Страница 102: ...102 19 WIRNING DIAGRAM ...