Installation Manual | V1.0.0 | 16
Installation on 6 - 10 - 12-wheel truck configuration
1.
Identify the number of height valves on the truck.
2.
For each system controlled by a valve, an air line must lead to the TrackWeight
communication box.
3.
Cut the air line as close as possible to the balloon to insert a
BRT 5053
or
BRT 5055
"T" fitting (depending on the size of the air line tube) on each group of balloons
controlled by a valve.
Note: If the system is controlled by a single height valve and a dial already indicates
the air pressure, it is possible to connect to this pressure indicator in the cab.
4.
Insert the cut air line and ¼"
BRT 5220
tube into the "T" fitting and lead this tube to
the front of the truck.
5.
Insert the
BRT 5220
tube into the
BRT 5792
fitting to connect it to the
BRT 560
air
sensor, installed in the cab, to then connect the same sensor to the communication
box. Identify the lines in order to properly configure the inputs in the communication
box afterwards.
Note: Make sure that the sensor is installed vertically, downwards, to prevent water
or condensation from accumulating in the sensor and damaging it.
Содержание BRT 5
Страница 1: ...INSTALLATION MANUAL SCALES FOR TRUCKS BRT4 BRT5 SERIES I V1 0 0...
Страница 2: ......
Страница 5: ...Installation Manual V1 0 0 5 Main configurations Semi trailer...
Страница 6: ...Installation Manual V1 0 0 6 6 10 wheel truck...
Страница 26: ...Installation Manual V1 0 0 26 Appendix 2 Rustproof Weld Procedures...