5.
5.1
1
2
3
5.2
1
2
3
4
INSTALLAT
PREPAR
1.
Verify
2.
Verify
3.
Verify
4
P
INSTALL
1.
Power
Bracel
2.
Verify
3.
Discon
4.
Insert
tag.
TION
INSTRU
RATIONS
y
that
you
h
Beacon
Offenders
Offenders
Fiber
optic
Portable
b
y
that
you
h
Strap
cutt
Needle
‐
no
T25
Allen
Double
sid
Spare
stra
y
that
the
O
Connect
charging
c
rogrammin
Debugger
a
by
Texas
i
proprietar
L
THE
OFF
r
up
the
tag
ets'
chargin
that
the
Po
nnect
the
ta
the
side
of
UCTIONS
have
all
kit
c
s
Bracelet
s
Bracelet
po
c
strap
battery
pack
have
the
ne
ing
tool
ose
pliers
key
ded
tape(on
aps
and
lock
Offenders
B
the
suppli
connector
fo
g
kit
for
be
and
Program
nstruments
ry
adapter
FENDERS
B
g
by
connec
ng
connecto
ower
LED
tu
ag
from
the
f
the
strap
t
10
component
ower
charg
k
ecessary
inst
n
the
Beaco
king
pins
racelets'
ba
ed
power
or
2
‐
3
hour
acon
device
mmer
for
RF
S
s,
8051
‐
base
BRACELET
cting
the
su
or.
rns
Green.
power
ban
that
has
fo
ts:
er
tallation
too
on
itself)
attery
is
full
bank
to
s.
e
System
‐
on
‐
C
ed
system
‐
o
T
upplied
pow
k.
It
is
now
ur
holes
int
ols:
y
charged
the
Offend
Chips
on
‐
chips
.
wer
bank
to
ready
for
u
to
the
right
ders
Brace
o
the
Offen
use.
t
bracket
of
elets'
ders
f
the