Trace Sun Tie ST1000 Скачать руководство пользователя страница 5

©2000 Xantrex/Trace Engineering

iii

SAVE THESE INSTRUCTIONS

IMPORTANT SAFETY INSTRUCTIONS

This manual contains important safety instructions that should be followed during the installation

and maintenance of this product.

To reduce the risk of electrical shock, and to ensure the safe installation and operation of this

product, the following safety symbols have been placed throughout this manual to indicate

dangerous conditions and important safety instructions.

WARNING - 

A dangerous voltage or condition exists in this area.

Use extreme caution when performing these tasks.

AVERTISSEMENT -

 Une tension ou condition dangereuse existe dans cette zone.

Faire preuve d’extrême prudence lors de la réalisation de ces tâches.

CAUTION - 

This procedure is critical to the safe installation or operation of the unit.  Follow these

instructions closely.

ATTENTION -

 Cette procédure est essentielle à l’installation ou l’utilisation

de l’unité en toute sécurité.  Suivre ces instructions de près.

NOTE - 

This statement is important.  Follow instructions closely.

NOTE - 

Cette déclaration est importante.  Suivre les instructions de près.

•

All electrical work must be done in accordance with local and national electrical codes.

•

Before installing or using this device, read all instructions and cautionary markings located in

(or on) the manual, the ST and the PV array.

•

Do not expose this unit to rain, snow or liquids of any type without the rain/weather shield

hood installed (optional on some models).

•

To reduce the chance of short-circuits when installing or working with the inverter or the PV

array, use insulated tools.

•

Remove all jewelry such as rings, bracelets, necklaces, etc., prior to installing this system.

This will greatly reduce the chance of accidental exposure to live circuits.

•

The ST unit contains more than one live circuit (PV array and AC line). Power may be present

at more than one source even when the circuit breakers are off.

•

This product contains no user serviceable parts. Return the unit to a Trace Authorized Service

Center for maintenance.

•

Wiring to the utility should only be done after receiving prior approval from the utility company

and performed only by a qualified electrician.

•

Completely cover the surface of all PV arrays with an opaque (dark) material BEFORE wiring

them. PV arrays produce electrical energy when exposed to light, and could create a

hazardous condition.

Содержание Sun Tie ST1000

Страница 1: ...Installation and Operator s Manual 2000 Xantrex Trace Engineering Sun Tie Inverter ST1000 ST1500 ST2000 and ST2500 975 0003 01 02 Rev A 11 00...

Страница 2: ......

Страница 3: ...Grounding 5 AC Grounding 5 DC Grounding 5 PV Arrays 5 AC Circuit Breakers 6 Wire Routing 6 Mounting 7 Wiring 11 DC Wiring 11 PV Array 11 ST1500 and ST2500 DC Wiring 11 PV Array Conduit Wire Run 11 ST1...

Страница 4: ...ns or methods of installation operation use and maintenance of the unit are beyond the control of Xantrex Trace the company does not assume responsibility and expressly disclaims liability for loss da...

Страница 5: ...les instructions de pr s All electrical work must be done in accordance with local and national electrical codes Before installing or using this device read all instructions and cautionary markings lo...

Страница 6: ...m grounding and other electrical details are not included DC Input Voltage AC Output Voltage Main Utility Service Panel AC Utility Meter Solar Power AC to Grid Solar PV Array 975 F00 008SA ON OFF ON O...

Страница 7: ...um Power Point Tracking The inverter performs a power sweep every minute adjusting array voltage and current maximizing PV power generation Maximum Power Point Tracking MPPT ensures the system produce...

Страница 8: ...unter optional utility knife Hardware Materials required wood screws and washers supplied conduit and appropriate fittings anchors for screws material dependent AC Connections The inverter s AC output...

Страница 9: ...AWG 6 AWG 7 0 10 9 12 AWG 8 AWG 6 AWG 9 0 14 0 10 AWG 8 AWG Not Recommended 11 0 17 2 10 AWG 6 AWG Not Recommended 975 000 002 Table 2 Recommended Minimum DC Wire Sizes NOTE These are the minimum rec...

Страница 10: ...6 AWG 4 AWG 1 AWG 30 46 8 4 AWG 2 AWG Not Recommended 40 62 4 4 AWG 1 AWG Not Recommended 60 93 6 2 AWG Not Recommended Not Recommended 975 000 004 Table 3 Recommended Minimum DC Wire Sizes NOTE The N...

Страница 11: ...ates within the MPPT operational window The solar array connected to the ST Series inverter should have a minimum of 50 volts DC open circuit in full sunlight conditions Crystalline solar arrays confi...

Страница 12: ...nal ground rod All wiring and installation methods should conform to applicable electrical and building codes Pre plan the wire and conduit runs The DC terminal blocks accept up to a 6 AWG wire ST1500...

Страница 13: ...ground mount the bracket 70 inches from the ground 3 If required remove the bracket and drill the holes using a 10 0 193 inch diameter drill bit Drill appropriately sized holes for anchors when insta...

Страница 14: ...ing continued Figure 4B Enclosure Mounting 4068 E00 002 Screw holes Enclosure mounted on wall bracket 3 20 26 21 32 19 64 8 55 64 4 13 16 9 41 64 Slide ST enclosure lip onto bracket 4068 E00 001 Sun T...

Страница 15: ...Figure 5 Outer Cover Components Figure 6 Inner Breaker Cover Remove breaker screws Lift up and pull forward to remove Remove screws from tabs Locking tabs Upper cover External breaker cover remove du...

Страница 16: ...ternal mounting holes DC Conduit AC Conduit PV Combiner Board included on some models NOTE The internal Combiner Board is not available on all models Lightning Arrestor 5 1 64 9 15 32 11 13 64 61 64 6...

Страница 17: ...is used label the wire pairs positive and negative appropriately i e PV 1 PV 2 etc 3 Connect the positive wire from the 1 array to the terminal strip labeled PV INPUT 1 POSITIVE terminal Check that t...

Страница 18: ...or each PV array circuit connecting the 2 PV Negative wire to the terminal labeled PV INPUT 2 NEGATIVE etc NOTE The solar arrays do not have to connect in the order marked on the board this is just fo...

Страница 19: ...e wire from the array to the 100 amp DC CIRCUIT BREAKER s lower terminal Check that the wire is in the proper location and tighten the screw Figure 10 4 Connect the negative wire from the PV array to...

Страница 20: ...R ALL WIRING IS COMPLETED AS INSTRUCTED IN THE PROCEDURES 1 Run conduit from the main utility breaker panel to the lower section of the ST unit Run the two HOT wires L1 and L2 and ground through the c...

Страница 21: ...ON 2000 Xantrex Trace Engineering Figure 11A 240 V AC Connection Points ST1500 and ST2500 L1 L2 GROUND bar AC conduit and wiring 240 VAC L1 L2 GROUND bar 240 VAC Figure 11B 240 V AC Connection Points...

Страница 22: ...D AT POINTS A AND B TO THE INVERTER ENCLOSURE THE UTILITY METER MUST BE A BI DIRECTIONAL METER OBTAIN UTILITY COMPANY APPROVAL BEFORE INSTALLING PVGFP AND COMBINER BOARD MAY NOT BE PRESENT ON SOME MOD...

Страница 23: ...t route to dissipate lightning strikes via the close ground rod Tie this ground rod to the main utility ground rod via a heavy gauge 8 6 AWG bare copper wire which can be buried underground Tieing the...

Страница 24: ...ure all circuit breakers located in the ST unit are in the OFF down position 3 Switch ON the ganged 15 amp ST circuit breakers located in the main breaker service panel This applies the utility suppli...

Страница 25: ...C positive and negative terminals This voltage must be greater than 50 volts DC for 5 minutes minimum to start the inverter NOTE Some thin film modules amorphous may produce an open circuit voltages 1...

Страница 26: ...C circuit breaker located in the ST unit This breaker supplies the DC power from the PV array to the ST unit Refer to Figure 16 item 2 3 Switch the 1 and 100 amp ganged PVGFP breakers to ON if install...

Страница 27: ...the inverter will lock on to the array voltage and begin to sell the maximum amount of power possible under the conditions This algorithm known as maximum power point tracking MPPT operates an effici...

Страница 28: ...the two screws located on the bottom of the unit Reinstall the screws on the front of the panel that secure it to the circuit breaker Figure 19 Replace Outer Cover and Screws 7 Replace the external co...

Страница 29: ...Replace Outer Cover and Screws Start up Procedure continued 8 Install rain shield hood if located outdoors Figure 20 Install the rain shield onto the ST enclosure Secure it with the four screws provi...

Страница 30: ...the inverter before removing the panel to allow the components to discharge DO NOT REMOVE THIS COVER FOR ANY OTHER PURPOSE Remove the Rain Shield if installed by removing the two screws from each side...

Страница 31: ...25 4 0 TROUBLESHOOTING 2000 Xantrex Trace Engineering Figure 22 CPU Board and LED Location CPU Board Red LED Green LED Close up of LED area...

Страница 32: ...p s e c n a r e l o t e t a i r p o r p p a e h t n i h t i w t o n a h t i w y c n e u q e r f d n a e g a t l o v C A e h t k c e h C o t r e w o p d i r g r o f t i a W r e t e m y c n e u q e r f...

Страница 33: ...e d y c n e u q e r f d n a e g a t l o v C A r e d n u r e v O y a l p s i d r e s U s t l o v C A s p m a C A y a l p s i d D C L c i r e m u n a h p l a t h g i l k c a B s m r d e c u d o r p h W...

Страница 34: ...___________________________________ Country ________________________________________________ Problem ________________________________________________ __________________________________________________...

Страница 35: ...ducts must be returned to Xantrex Trace Engineering or its Authorized Service Center in the original packaging or equivalent The cost of transportation and insurance on items returned for service is t...

Страница 36: ......

Страница 37: ......

Страница 38: ......

Страница 39: ......

Страница 40: ...visit our website at www traceengineering com 5916 195th Street N E Arlington WA 98223 Phone 360 435 8826 Fax 360 435 2229...

Отзывы: