Issue Date: 4-19-02 Rev. Date: 11-10-04 Rev. Level: 10 OIPM P/N 3420458
Page 3 of 24
Tools required: (2) ¾” socket or box wrenches.
Parts required: the two screws required to secure
wall/ceiling bracket to a suitable surface are not
supplied with heater. You must use 5/16” bolts and
flat washers to mount this bracket.
Hanger Assembly Detail
YES - SERIES INSTALLATION
HANGER
Step 1
: Install (1) side rotating stop over
bolt and into curved slot (as shown at
right) on each side of heater.
Step 3
: Secure wall/ceiling mounting bracket to appropriate
surface that will support a min. weight of 100lbs continuously.
NOTE: all mounting hardware to mount hanger to wall/ceiling
bracket is supplied with heater.
KNOB
ALL Fostoria YES models require some assembly. Four steps are required to complete the assembly and installation.
TOP of
Heater
Step 2
: Assemble hanger to heater per hanger
assembly detail. No tools are required.
Ceiling Mount Option
Step 4
: Assemble unit to mounting bracket following
instructions of chosen mounting option below.
Wall Mount Option #1
TOP ROTATING
STOP
TOP
of
Heater
FALLING OBJECTS HAZARD
FIRE HAZARD
•
Serious injury or death
may occur.
•
Read and follow all safety
information and
instructions in box below.
•
Mounting bracket supplied with YES models
MUST be used to support heater.
•
Installer MUST be certain surface that
bracket is mounted to will support 100 lbs of
weight continuously.
•
Rotating stops MUST be installed as shown
above.
•
Do not mount heater upside down (See
nameplate label for “TOP” of heater.)
•
The bottom of these units must be mounted at
least 6 ft. off the floor and the top 2 ft. from
the ceiling.
•
Do not suspend ANY other equipment from
this bracket. One heater per bracket
maximum.
Wall Mount Option #2
TOP
of
Heater
All manuals and user guides at all-guides.com