10/100/1000Base-TX (Electrical port) 

When use the single mode optical fiber, the maximum transmission distance can be up to 10-40km; 
when use the multimode fiber, the maximum transmission distance is less than 500 meters. 

Gigabit Ethernet uplink port supports the duplex mode and flow control auto negotiation. 

But need note that the maximum length of the optical fiber is related with work mode of the optical 
fiber: 

 

Maximum length of 1000Base-LX fiber is depend on duplex mode. 

 

Maximum length of 1000Base-SX fiber is the same in both full duplex and half duplex mode. 

3.4.1.2  Port Connection 

There are two kinds of uplink network connection: 

 

Cable with RJ45 connectors at both sides 

 

Cable with LC connector at both sides 

Decide the port type of OLT according to the port type of the uplink device (Switch or Route). 

3.4.1.3  Method of making cable 

If  you  use  SFP  optical  module,  cable  specification:  the  optical  cable  with  LC  connector  at  both 
sides. 

If you use GE copper interface, cable specification: Category 5 cable or Category5 super cable 
with RJ45 connector at both sides45. 

The  below  the  reference  for  making  STP  (Shielded  Twisted-Pair)  cable  with  RJ45connector  at 
both sides. 

 

3.4.2 PON Port Connection 

P1200-08  support  eight  GPON  SFP  slots,  every  SFP  GPON  slots  can  mount  a  GPON  SFP 
module and provides one PON port. 

Caution: When insert into optical cable, please confirm the connector is inserted into the 
correct position, thus guarantee the good contract. 

Содержание P1200-08

Страница 1: ...Installation User Guide GPON OLT P1200 08 Version V1 0...

Страница 2: ...s are trademarks or registered trademarks of their respective holders No part of the specifications may be reproduced in any form or by any means or used to make any derivative such as translation tra...

Страница 3: ...n 5 3 3 1 Plane stack installation 5 3 3 2 Rack Installation 5 3 4 Port and Connection 6 3 4 1 Uplink Port 6 3 4 2 PON Port Connection 7 3 4 3 Ground Cable Connection 8 3 4 4 Management Port Connectio...

Страница 4: ...he network applications Figure 1 1 P1200 08 in GPON system 1 2 Functional Features Comply with ITU T G 984 G 988 standards and China s Telecom industry GPON standards Support OMCI remote management of...

Страница 5: ...ace The P1200 08 1U high Pizza Box can be mounted into the standard 19 rack Demission of machine frame 440mm L 391mm W 44mm H As shown below Figure 1 2 Front View of P1200 08 See the following table I...

Страница 6: ...link with the OLT port n GE n n 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Flash There is the communication data at the uplink port n Green Always ON The uplink port n is connected OFF The uplink port n i...

Страница 7: ...mperature is 0 C 40 C To ensure that equipment works in the normal temperature environment 25 C or so should try to make the equipment away from the main heat source such as power supply etc if the en...

Страница 8: ...ent need connect the following equipment with OLT A management platform such as PC RJ45 DB9 RS232 Console line 3 3 OLT Installation OLT can be put in the bigger horizontal surface or within the standa...

Страница 9: ...the cabinet Step IV Use screws to fix the suspension loops of the cabinet to the square holes of the 19 inch cabinet column and to fix the OLT device to the cabinet 3 4 Port and Connection The chapte...

Страница 10: ...k connection Cable with RJ45 connectors at both sides Cable with LC connector at both sides Decide the port type of OLT according to the port type of the uplink device Switch or Route 3 4 1 3 Method o...

Страница 11: ...t access marked as MGMT RJ45 type port Console access is really only required when initially configuring a device or if remote access fails Console access requires Console cable RJ 45 to DB 9 console...

Страница 12: ...y unit Additionally to ensure true AC line input redundancy for the OLT you should connect each AC power cable to a different AC power source You can also connect an uninterruptible power supply UPS b...

Страница 13: ...DC input power cable 3 5 OLT working status checkout 3 5 1 Check out power supply Before you connect the power supply double check the power supply if it is accord with the power supply requirements I...

Страница 14: ...sword admin 5 Appendix OLT Specification Item Specification Chassis Rack 1U 19 inch standard box Slots 1 10 Gigabit uplink card slot 2 power module slot Uplink Port Copper 8 10 100 1000M auto negotiab...

Страница 15: ...tate monitoring configuration management equipment log equipment upgrades equipment management user management Layer 2 switch configuration such as Vlan Trunk RSTP IGMP QOS etc PON management function...

Отзывы: