background image

07

 L2 Managed Switch

3. Turnover the device and attach the supplied rubber feet to the recessed areas on 

the bottom at each corner of the device.

TL-S

G5

42

8

Feet

Bottom of the 

Device

Notch

Figure 2-1  Desktop Installation

 

Rack Installation

To install the device in an EIA standard-sized, 19-inch rack, follow the instructions 
described below:
1. Check the grounding and stability of the rack.
2. Secure the supplied rack-mounting brackets to each side of the device with supplied 

screws, as illustrated in the following figure.

TL-SG5428

Rack-

mounting 

Bracket
Screw

Figure 2-2  Bracket Installation

3. After the brackets are attached to the device, use suitable screws (not provided) to 

secure the brackets to the rack, as illustrated in the following figure.

TL-SG5428

Rack

Figure 2-3  Rack Installation 

Caution:

 

Please set 5~10cm gaps around the device for air circulation. 

 

Please avoid any heavy thing placed on the device.

 

Please mount devices in sequence from the bottom to top of the rack and ensure a 

certain clearance between devices for the purpose of heat dissipation.

Installation

Содержание JetStream TL-SG5412F

Страница 1: ...Installation Guide L2 Managed Switch TL SG5428 TL SG5412F Business Networking Solution...

Страница 2: ...nment This equipment generates uses and can radiate radio frequency energy and if not installed and used in accordance with the instruction manual may cause harmful interference to radio communication...

Страница 3: ...ing installation This Installation Guide is structured as follows Chapter 1 Introduction This chapter describes the External Components of the Switch Chapter 2 Installation This chapter illustrates ho...

Страница 4: ...illustrate Chapter 2 Installation Chapter 3 Lightning Protection and Chapter 4 Connection This guide uses the specific formats to highlight special messages The following table lists the notice icons...

Страница 5: ...Protection 08 3 1 Cabling Reasonably 08 3 2 Connect to Ground 10 3 3 Equipotential Bonding 11 3 4 Use Lightning Arrester 12 Chapter 4 Connection 13 4 1 Ethernet Port 13 4 2 SFP Port 13 4 3 Console Por...

Страница 6: ...nd multiple powerful functions with high security The EIA standardized framework and smart configuration capacity can provide flexible solutions for a variable scale of networks ACL 802 1x and Dynamic...

Страница 7: ...port and data is being transmitted or received Yellow On A 10 100Mbps device is linked to the corresponding port and there is no activity Flashing A 10 100Mbps device is linked to the corresponding p...

Страница 8: ...ed to connect with the serial port of a computer or terminal for monitoring and configuring the Switch Rear Panel Due to the similarity of TL SG5428 and TL SG5412F in the rear panel here TL SG5428 is...

Страница 9: ...ded with the switch Make sure that the supply voltage matches the specifications indicated on the rear panel of the switch Ensure the vent hole is well ventilated and unblocked Do not open or remove t...

Страница 10: ...tatic electricity on the operation of the Switch please attach much importance to the following items Dust the device regularly and keep the indoor air clean Keep the device well grounded and ensure s...

Страница 11: ...ch is flat and stable and sturdy enough to support the weight of 5 5kg at least The rack or workbench has a good ventilation system The equipment room is well ventilated The rack is well grounded Keep...

Страница 12: ...ch side of the device with supplied screws as illustrated in the following figure TL SG54 28 Rack mounting Bracket Screw Figure 2 2 Bracket Installation 3 After the brackets are attached to the device...

Страница 13: ...or shielding Before connecting the cable to the device install a signal lightning arrester on the corresponding port When an aerial cable is set up the cable should be through a metal pipe 15m long at...

Страница 14: ...you can add a steel tube or metal raceway for shielding Requirements for the distance between Ethernet cable and high power electric devices are in following tables Cable Pave Way Min Parallel Length...

Страница 15: ...cific operation environment Connecting to the Grounding Bar If the device is installed in the Equipment Room where a grounding bar is available you are recommended to connect the device to the Groundi...

Страница 16: ...the ground or overground metal so as to create an earthed equipotential zone When lightning occurs the high voltage produced by lightning current in all systems will meanwhile exist in their ground ca...

Страница 17: ...signal lightning arrester please observe the following rules The port rate of the signal lightning arrester should match the rate of the desired port on the device If it is not matched this signal li...

Страница 18: ...nnection of SFP port to a SFP module TL SG542 8 SFP Slot Figure 4 2 Inserting the SFP Module Note A Combo port refers to two Ethernet interfaces in a device panel normally one is an SFP slot and the o...

Страница 19: ...gle mode fiber Multi mode fibers generally have a larger core diameter and are used for short distance communication links and for applications where high power must be transmitted Single mode fibers...

Страница 20: ...on the right of the front panel Please keep the device power off when plugging the console cable Do not connect the console port with other ports by RJ45 cable 4 4 Verify Installation After completin...

Страница 21: ...powered on it begins the Power On Self Test A series of tests run automatically to ensure the device functions properly During this time its LED indicators will respond in the following order The PWR...

Страница 22: ...the switch The IP address is 192 168 0 x x is any number from 2 to 254 Subnet Mask is 255 255 255 0 For the detailed instructions as to how to do this please refer to Appendix B in the User Guide on...

Страница 23: ...on the PC 3 Configure the terminal emulation program or the terminal to use the following settings Baud rate 38400 bps Data bits 8 Parity none Stop bits 1 Flow control none 4 The DOS prompt TP LINK w...

Страница 24: ...the command prompt shown as Figure 5 6 and press the Enter button Figure 5 6 Connecting to the switch 4 Type the User name and Password the factory default value for both of them is admin and press t...

Страница 25: ...s the requirement of the input voltage of the switch Q3 What could I do if I could not access the web based configuration page You are recommended to check the following items 1 Check every port LED o...

Страница 26: ...10Base T UTP STP of Cat 3 or above 100m 100Base TX 2 pair UTP STP of Cat 5 or above 100m 1000Base T 4 pair UTP STP of Cat 5e or above 100m 1000Base X MMF or SMF SFP Module Optional LEDs PWR SYS 1000Mb...

Страница 27: ......

Страница 28: ...Website http www tp link com Tel 86 755 26504400 E mail support tp link com 7106505361 REV2 0 3...

Отзывы: