– 19 –
PERFORMANCE CURVE DIAGRAM
REMARKS FOR GAS PRESSURE CHECK AND CHARGING
Gas pressure is to be measured at COMPULSORY COOLING OPERATION for cooling or EMERGENCY
OPERATION for heating. (It is operated for 30 minutes at 58Hz fixed frequency.)
If you find substantial diffrence in performance compared with PERFORMANCE CURVE as shown next,
recharge the refrigerant.
(In order to avoid excessive charging, purge all the remaining refrigerant first and then evacuate the unit
completely with vacuum pump and finally apply rated volume charging of refrigerant.)
Charging of refrigerant should be done by cooling operation, because the pressure at service valve will be
too high at heating cycle, then the heating performance characteristics must be checked by restarting of
heating operation.
Piping size
Max. tube length
Liquid side
Gas side
Max. height difference
6.35mm
9.52mm
15m
10m
Содержание TAG-A28FWIS
Страница 24: ... 23 ELECTRIC CIRCUIT DIAGRAM TAG A28FWIS TAG A32FWIS ...
Страница 30: ...ISSUED MAR 2005 RA 37 1 Printed in Japan ...