background image

                                  PRADO

 

FI Doc No: PZQ85-33270FI  -  Issue: 2   - 17/09/18

 

Page 1 of  23

 

 

 

04

 

 

JUNE 2018 PRODUCTION ONWARDS 

Part No: PZQ85-33270

 

Fitting Time: 45 minutes

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Dash Camera

 

Fitting Instruction 
 

 

 

Содержание PZQ85-33270

Страница 1: ...PRADO FI Doc No PZQ85 33270FI Issue 2 17 09 18 Page 1 of 23 04 JUNE 2018 PRODUCTION ONWARDS Part No PZQ85 33270 Fitting Time 45 minutes Dash Camera Fitting Instruction ...

Страница 2: ...ll bare metal surfaces are protected using Automotive Bare Metal Primer and touch up paint Remove all metal swarf and dust from all vehicle surfaces if surface is used for accessory installation Safety Notes Check that all work practices comply with safety standards Please wear appropriate clothing and use safety equipment Fitting Time 45 minutes Parts Supplied A B C D E F G H I J K L M N O Cable ...

Страница 3: ...NE 2018 PRODUCTION ONWARDS Part No PZQ85 33270 Tools and Material Required 8mm and 10mm Rachet 10mm Torque Wrench pre set to 8 5Nm Side cutter Plier Phillip head screw Trim removal tool Standard business card or driver license or credit card size paper 55mm x 85mm ...

Страница 4: ...DUCTION ONWARDS Part No PZQ85 33270 Step 1 Disconnect the negative battery terminal Step 2 Remove left hand side instrument cluster panel as shown Step 3 Remove left hand side under cover as shown Always refer to the vehicle s Workshop Manual when removing vehicle components ...

Страница 5: ... 2 17 09 18 Page 5 of 23 JUNE 2018 PRODUCTION ONWARDS Part No PZQ85 33270 Step 4 Remove left hand side front console cover Step 5 Remove left hand side front door scuff plate as shown Step 6 Remove left hand side cowl side trim as shown ...

Страница 6: ... Page 6 of 23 JUNE 2018 PRODUCTION ONWARDS Part No PZQ85 33270 Step 7 Remove left hand side instrument side panel as shown Step 8 Remove indash cluster panel as shown Step 9 Remove glove box as shown Step 10 Remove left hand side register as shown ...

Страница 7: ... 17 09 18 Page 7 of 23 JUNE 2018 PRODUCTION ONWARDS Part No PZQ85 33270 Step 11 Remove left hand side assist grip Remove left hand side A Pillar panel as shown Step 12 Remove heat control panel as shown Step 13 Remove sat nav unit as shown ...

Страница 8: ...e 2 17 09 18 Page 8 of 23 JUNE 2018 PRODUCTION ONWARDS Part No PZQ85 33270 Step 14 Remove instrument lower panel left hand side Step 15 Remove instrument lower switch panel right hand side as shown Step 16 Remove meter cluster as shown ...

Страница 9: ...S Part No PZQ85 33270 Step 17 Remove combination meter as shown Remove all connectors on the combination meter Step 18 Untighten the adjustment screw of the Dash camera Adjust the camera lens position to the 3rd mark from the left as per instruction Step 19 Install the dash camera end cap ...

Страница 10: ...rain sensor go straight to step 23 Step 20 Prepare 3 harness tape 40mm x 80mm Cover the dash camera wire as shown Step 21 Prepare fitting template A and adjust the template to the roof headliner edge and Toyota Safety Sense sensor as shown Use sticky tape to hold the template Prior to installing clean inside of the windscreen in the area to be installed using alcohol wipe cleaner ...

Страница 11: ... PZQ85 33270 Step 22 Peel out the adhesive tape on the dash camera Stick the dash camera by adjusting it to the template next to arrow mark as shown Remove the fitting template when the dash camera attached on the screen Please see the side view for the installation reference GO DIRECTLY TO STEP 28 ...

Страница 12: ... to step 28 Step 23 Prepare standard business card or driver license size paper 55mm width and 85 to 90mm length Take wire measurement 80mm 5mm from dash camera module From 80mm length start making wire loops using standard driver license or credit card size paper 55mmx 65mm Make 3 loops Step 24 Remove the paper from the wire loops Cable tie the middle of the wire loops Make sure the cable tie is ...

Страница 13: ...mplate B and adjust the template to the roof headliner edge and rain sensor as shown Use sticky tape to hold the template Step 27 Peel out the adhesive tape on the dash camera Stick the dash camera by adjusting it to the template next to arrow mark as shown Remove the fitting template when the dash camera attached on the screen Prior to installing clean inside of the windscreen in the area to be i...

Страница 14: ...28 Route the dash camera wire inside the roof headliner Prepare the cord guide and measure the length from the larger end to the dash camera Mark the desire length Please see the side view and top view of the cord guide installation for reference Step 29 After the measuring cut the adjusted length of the cord guide ...

Страница 15: ...rt No PZQ85 33270 Step 30 Insert the Dash camera wire into the cord guide Install the cord guide to the roof headliner as shown Step 31 Route dash camera wire to left hand side A pillar area Step 32 Cable tie the dash camera wire to the existing vehicle wire Do not cable tie vehicle water hose ...

Страница 16: ...e to the glove box area Step 34 Route the wire to the glovebox area Cable tie the wire on to the vehicle reinforcement bar Bundle and cable tie the excess wire on the right hand side of the reinforcement bar as shown Make sure the inter connection connector is in reachable Step 35 At the combination meter area locate 40 pin combination meter connector Peel the harness tape to get easy access to th...

Страница 17: ...bination meter connector Step 37 Battery signal installation Prepare yellow wire Blue Splice connector Splice yellow wire of the Blue Splice connector using Black Splice connector yellow wire Locate the vehicle Battery signal light blue wire pin no 21 Splice the vehicle Battery signal using Blue Splice connector with yellow wire The connector view is from wire side The connector view is from wire ...

Страница 18: ...e Splice connector Splice red wire of the Blue Splice connector using Black Splice connector red wire Locate the vehicle Battery signal Red wire pin no22 Splice the vehicle IG signal using Blue Splice connector with red wire Step 39 Cable tie the wire to the existing vehicle harness Re tape the exposed harness with PVC tape The connector view is from wire side ...

Страница 19: ... wire on the existing vehicle harness Step 41 Ground signal installation Locate vehicle ground signal near the vehicle reinforcement bar as shown Loosen the vehicle ground terminal s bolt Insert the dash camera ground terminal Tighten back the bolt Cable tie the excess wire on the existing vehicle harness on the right hand side of the glovebox area Make sure the interconnection connector is reacha...

Страница 20: ...process When booting process completed there will be a double high tone beep sound and green LED light will switch ON Then release the Action button If there is no beep sound repeat step 4 6 again 7 Switch OFF the vehicle engine and wait until the Dash Camera LED light is OFF for about 1 minute 8 Start the vehicle engine again Check the error light If the error light is still ON repeat step 7 agai...

Страница 21: ...PRADO FI Doc No PZQ85 33270FI Issue 2 17 09 18 Page 21 of 23 JUNE 2018 PRODUCTION ONWARDS Part No PZQ85 33270 DASH CAMERA CIRCUIT DIAGRAM ...

Отзывы: