PLAY
STEp 4 - MARK THE CENTERLINE OF THE WORK AREA
Now make a straight line on the ground using
String #1 to align all three Points (
A
,
b
and
C
). Tape down the
string at Point
A
and route the string under the vehicle to Point
C
.
Tip
Click
Help
Tip
Help
Click
Note
Note
DYNAMIC LASER CRUISE CONTROL SYSTEM 2008 - 2012 SEQUOIA
Quick Training Guide – QT512A
©Toyota Motor Sales, U.S.A., Inc., 2012
•
String #1 may be longer than is needed to make a straight line in this step.
• Make sure the string passes through Point B to ensure a straight line.