Open cavity to be enclosed 

with facing material

Figure 2:  Steel frame assembled for the Cool Wall 
Vent option.

Figure 3:  Lower 
venting box aligned to 
the steel frame.

Figure 4:  Lower venting box attached to the steel 
frame.

With the steel frame completed (Figure 
2), mount and secure the Lower Venting 
Box to the frame (Figure 3) using 
supplied hardware.

When the Lower Venting Box is secured 
to the steel frame, the front of the 
Lower Venting Box will have an open 
cavity exposed. This cavity will be 
enclosed once the Non-combustible 
facing material is installed (Figure 4). 

6

   Cool Wall TC42 070918-16

100001060

 Mounting the Lower Venting Box to Steel Frame 

Содержание TC42D

Страница 1: ...070918 16 Cool Wall TC42 100001060 Visit www townandcountryfireplaces com for the most recent version of this manual TC42D COOL WALL VENT KIT INSTALLATION MANUAL ...

Страница 2: ...Steel Frame 6 TC42 Lintel Knock outs 7 Steel Frame Lower Venting Box Affixed to TC42 8 Building the Lumber Frame 9 Mounting the Upper Grill 10 Installing the Flexible Ducting 12 Installation of Fireplace Venting 13 Distribution of Facing Material 14 Venting Near the Ceiling 15 Table of Contents 2 Cool Wall TC42 070918 16 100001060 ...

Страница 3: ...The Cool Wall Vent Kit includes The Upper Grill The Lower venting box Five Flexible ducts Hardware for installation 3 100001060 Cool Wall TC42 070918 16 Cool Wall Vent Kit Contents ...

Страница 4: ...t Contains ITEM DESCRIPTION QTY 1 SCREW TEKS 8 X 1 2 NOT SHOWN PKG 40 2 SIDE STUD VERTICAL INNER 53 3 4 L 2 3 SIDE STUD VERTICAL OUTER 53 3 4 L 2 4 CENTER STUD VERTICAL SHORT 2 ITEM DESCRIPTION QTY 5 STUD HEADER HORIZONTAL 58 1 4 L 1 6 STUD PLATE HORIZONTAL 1 7 BASE PLATE 2 8 FRAMING PLATE 4 4 Cool Wall TC42 070918 16 100001060 TC42 Steel Stud Framing Kit ...

Страница 5: ...nd secure the Lower Venting Box to the steel frame with provided hardware prior to mount ing the steel frame and Lower Venting Box onto the TC42 See Mounting the Lower Venting Box to Steel Frame on page 6 4 Attach the Assembled Frame with the Lower Venting Box to the Unit Align the assembled frame and Lower Venting Box to the TC42 and attach to the framing brackets Items 8 in Figure 1 Align the fr...

Страница 6: ...th the steel frame completed Figure 2 mount and secure the Lower Venting Box to the frame Figure 3 using supplied hardware When the Lower Venting Box is secured to the steel frame the front of the Lower Venting Box will have an open cavity exposed This cavity will be enclosed once the Non combustible facing material is installed Figure 4 6 Cool Wall TC42 070918 16 100001060 Mounting the Lower Vent...

Страница 7: ...aterial If the steel frame is positioned so that the Lintel protrudes from the steel frame to its maximum then the rear set of knock outs will be removed If the steel frame is positioned so that the Lintel protrudes minimally from the steel frame then the front row of knock outs will be removed Note Be sure of the final placement of the TC42 and its steel frame before deciding on which row of knoc...

Страница 8: ...ted into its final position The installer must keep in mind that the lumber framing will be built around the steel frame and the TC42 and so accurate positioning of the unit before construction of the lumber frame is critical Figure 7 Lower venting box and steel frame attached to the TC42 8 Cool Wall TC42 070918 16 100001060 Steel Frame Lower Venting Box Affixed to TC42 ...

Страница 9: ... frame to accommodate the Upper Grill Figure 8 but only the bottom horizontal header should be installed at this time The Flexible Ducting supplied comes in 3 foot lengths which can be stretched to approximately 5 1 2 feet to allow more distance between the Upper Grill and Lower Venting Box This allows for the installation of various sized television sets or other forms of wall hanging It is neces...

Страница 10: ...pper Grill will fit over the bottom header and can be secured at this time using the supplied hardware Once the Upper Grill is secured to the bottom header the upper header can then be fitted over top of the Upper Grill and secured to the lumber frame Figure 10 After the Upper Grill has been installed the lumber frame can be completed Figure 11 Figure 9 Upper grill secured to the bottom header Fig...

Страница 11: ...Figure 11 Upper grill secured to lumber framing 11 100001060 Cool Wall TC42 070918 16 ...

Страница 12: ...Installing the Flexible Ducting Once the Upper Grill is installed the Flexible Ducting can be installed using supplied hardware Figure 12 Flex ducting installed 12 Cool Wall TC42 070918 16 100001060 ...

Страница 13: ...e Vent can be installed at this time Figure 13 It may be necessary to remove the front stand offs if they interfere with the routing of the flexible ducting Figure 13 Side view with fireplace venting installed 13 100001060 Cool Wall TC42 070918 16 ...

Страница 14: ... Figure 14 for distribution of facing material The area above and on either side of the TC42 within the steel frame must grey area use Non combustible facing material The area outside of the steel frame may use Combustible facing material Dotted area It is important to note that all facing material must be a minimum of 1 2 inch thick The thickness of the facing material must be calculated into the...

Страница 15: ...ed as close to the ceiling as it is possible Figure 15 It is not necessary for the ceiling to be made with non combustible material The heat expelled from the Upper Venting Box is not high enough to damage the ceiling material Do not place combustibles such as electronics or artwork within the first 48 from the floor Figure 15 Side view of upper grill near ceiling 15 100001060 Cool Wall TC42 07091...

Страница 16: ...ion adaptation or translation without prior written permission is prohibited except as allowed under the copyright laws Printed in Canada For technical support please contact your retailer Web site www townandcountryfireplaces com 2975 Allenby Rd Duncan BC V9L 6V8 ...

Отзывы: