background image

TC42.NG04C 260411-16

8

NOTE:

  

Lift pebble assembly from bottom.
Do not lift by top rocks.
Hollowed out rock must cover the 
pilot.

NOTE:
Do not place trim rocks on top of 
the pebble assembly. Sooting
will occur.

Fig #14

Fig #15

14.  Remove pebble assembly from 
 

packaging by placing hand on top and  

 

tipping upside down. Gently place  

 

pebble assembly onto sand base 

 

using pins to locate position. 

 (Fig 

#14)

15.  

Place trim rocks at desired locations in the 
sand around the pebble assembly. Install 
glass door. Unit is ready for lighting.

Содержание TC42.NG04C

Страница 1: ...tion and Operating Instructions supplied with the fireplace and should be kept together Refer to the Installation and Operating Instructions for proper gas supply safety requirements and operating instructions TC42 TRANQUILITY BURNER KIT INSTRUCTIONS PART TC42 NG04C For TC42 Series C 260411 16 TC42 NG04C 5056 426C4 ...

Страница 2: ...e not required to attach this style of burner 1 Bend flex lines into the approximate shape Fig 1 2 Place covers under the burner tray Fig 2 3 NOTE Shutter must be fully closed for Natural gas fully open for Propane Contents of Package 1 BURNER ASSEMBLY 1 PANEL BASE 1 PEBBLE ASSEMBLY 1 COVER RHS 1 COVER LHS 3 4 LBS SAND 1 BAG TAPERED PLUGS Tranquility Burner Installation Fig 1 Fig 2 Fig 3 ...

Страница 3: ...assembly into the firebox against the rear panel Fig 4 Place panel clips under both rear corners of the base plate as shown in Fig 4a approx 3 from rear panel 4 Attach the manifold supply tube and the pilot supply tube to the bulk head fittings and tighten Fig 5 Ensure that there are no leaks Fig 4 Fig 5 Fig 4a ...

Страница 4: ...ODULE BULKHEAD PLATE 2 SCREWS 5 Secure the electrical bulkhead plate and gaskettothefirebox 2screws Attachthe ignition and sensor wires to the module Red end to the connector marked by the red dot white end to the connector marked by the white dot Fig 6 7 Fig 6 Fig 7 ...

Страница 5: ... Remove panel retainer from upper heat shield Install right porcelain panel tilting in from front corner Fig 8 Slip the side panels into the panel clip as shown in Fig 9 Finish the installation as per instructions Fig 8 Fig 9 ...

Страница 6: ...panel and behind the right panel While supporting the upper rear panel install and secure left porcelain panel in the same manner as the right panel Fig 10 8 Securewiththepreviouslyremovedpanel retainer 9 Slide covers out and attach to base with one screw each Fig 11 Fig 10 Fig 11 ...

Страница 7: ...s into raised burner portstopreventsandfromenteringports Fig 12 11 Place sand in tray Brush sand smooth andleveltojustbelowtopofraisedburner ports Fig 13 12 Gently blow excess sand from around ports 13 Remove tapered plugs from ports Fig 12 Fig 13 ...

Страница 8: ...ocks on top of the pebble assembly Sooting will occur Fig 14 Fig 15 14 Remove pebble assembly from packaging by placing hand on top and tipping upside down Gently place pebble assembly onto sand base using pins to locate position Fig 14 15 Placetrimrocksatdesiredlocationsinthe sandaroundthepebbleassembly Install glass door Unit is ready for lighting ...

Страница 9: ...ge the burner tube from the orifice Then tip back to expose the orifice 3 Using a 1 2 wrench undo the natural gas burner orifice marked 25 Apply a small amount of pipe joint compound to the threads of the propane burner orifice marked 3 32 to ensure a good seal before screwing it into the fitting Loosen the primary air shutter screw open shutter fully and re tighten Fig 17 4 Remove the 2 screws ho...

Страница 10: ...imum rate screw located in the valve Fig 21 The minimum rate screw is sealed with an o ring Use a thin bladed screwdriver to back the screw out past the limit of the threading At this point a groove on the screw body will be visible just above the valve body Insert a thin tool knife blade or fine screwdriver blade into the groove and gently pry the screw up 9 Replace the minimum rate screw with th...

Страница 11: ... removed Fig 25 Fig 23 Fig 24 Fig 25 NG LP LP GAS DU GAZ LP 12 5 in wc 12 5 po c e 3 11 kPa 13 9 in wc 13 9 po c e 3 45 kPa 11 0 in wc 11 0 po c e 95 kPa 3 32 2 38 mm Max 61 000 17 9 Min 46 200 13 5 260411 6 TC42C 5052 5206C Date ______________________ By Par ___________________ Kit TC42 LPKTB EB EC for use with model Pour utilise avec du modèle This appliance was converted to PROPANE GAS with thi...

Страница 12: ...be required to ensure a gas tight connection Note To test the gas pressure turn off the gas supply before removing the plug from the supply pressure test port or manifold pressure test port Verify gas pressures with the fireplace lit and on the highest setting SUPPLY PRESSURE MANIFOLD PRESSURE Fig 27a Correct gas pressure requirement Supply Pressure Natural Gas Propane Min Pressure 5 0 WC 12 5 WC ...

Страница 13: ...fireplace has reached operating temperature See Fig 28 for proper flame pattern Open primary air if the window glass and firebox have carbon accumulation and or the flames are long dark and stringy The shutter may also be opened to lessen the flame height NOTE Proper air shutter setting is required For Propane the primary shutter must be fully open The flame should be just orange and lazy It shoul...

Страница 14: ...lacement Parts 1 BURNER ASSEMBLY 1a TRANQUILITY CURB 1b 19 PORT CAST BURNER 1c ROCK PAN 1d LINE COVER LT 1e TRANQUILITY LEG 1f FLOOR PAN 1g TAPPED 1 8 27 NPT 1h LINE COVER RT 1i BURNER INLET TUBE 1j CURB CLAMP 2 PEBBLE ASSEMBLY 3 MAIN SUPPLY TUBE 4 PILOT TUBE 5 PILOT ASSEMBLY CONVERTIBLE 6 ORIFICE NG 25 TAPERED PLUGS not shown 7 PROPANE CONVERSION KIT not shown 8 SAND not shown 2 PEBBLE ASSEMBLY 3...

Страница 15: ...TC42 NG04C 260411 16 15 ...

Страница 16: ...Technical support 1 250 748 1184 Web site www townandcountryfireplaces net 2975 Allenby Rd Duncan BC V9L 6V8 Printed in Canada ...

Отзывы: