- 6 -
tousek
/ E_PASS-838_02 / 22. 10. 2018
Push the barrier boom carrier
(M)
onto the drive shaft
(A)
, so that the knocked-in metal key drives into the nut
(M.N).
Now slide the slide-in module
(E)
as shown into the boom so that the drillings fall in line with the boom.
Then bolt 4 x (with discs) the boom carrier
(M)
with the slide-in module inside boom
(E).
Now connect the boom
(B)
with cylinder head bolt (M10 x 40) and disc with drive shaft
(A)
(close the opening of boom
with plastic plug)
Attach the plastic covers onto the boom and drive shaft end.
Fixing the flat boom (example as left barrier)
M
housing backside
(example shows boom mount for
left barrier)
left barrier
right barrier
S1
S2
View S2
(Arrangement of mounting parts for left barrier)
Balkenoberseite
Important
• make sure to slide the slide in module (E) for both
mounting types (left/right) into the boom so that the
dropping (E.S) for the cylinder head bolt turns away
from barrier housing.
E
E.S
B
View S1
(boom carrier)
View S1
M.N
M
4 x
M
A
E
B
M.N