background image

Copyright © 2016 TouchTunes Music Corporation

TouchTunes Music Corporation

400 Sainte Croix Avenue, Suite 200 E
Montreal, Quebec,
Canada,   H4N 3L4

TouchTunes Music Corporation

850 Third Ave, Suite 15C
New York, NY 10022
USA

Technical Support

847-353-1954
www.touchtunes.com

7

Virtuo Test Fixture Installation Guide

Powering Up

Powering Up

1. Review all the cabling to ensure that all the components that need to be connected are securely connected.
2. On the power bar you where you connected the amplifier and power supply’s power cables, flip the power 

switch to turn everything on.

3. Watch the monitor and the lights on the I/O board, computer and power supply to validate that all the 

components are functional.

4. If the screen remains black while the computer still appears to be functional, press the red PWR button on 

the I/O board, in order to bring the Virtuo test station out of standby mode.

You should now have a functional Virtuo Test Station.

Contacting TouchTunes Technical Support

If you need help with or have questions about this document, contact TouchTunes by:

using the e-mail links on the Contacts page on the TouchTunes Dashboard at

https://operator.touchtunes.com

calling TouchTunes 24/7 Service Hotline at 847-353-1954

To help us assist you more effectively with problem reports, this information may be required when contacting 
TouchTunes Support:

Jukebox model, such as Virtuo, Allegro MX-1, Ovation, Maestro II

Jukebox ID

the serial number of any component you believe to be defective

the date/time of the problem

actions performed immediately before the problem occurred

any additional comments

Содержание Virtuo Test Fixture

Страница 1: ...quired Tools and Equipment Hex ratchet with M4 socket Mounting screws or bolts for mounting the fixture to a wall or other mounting structure Appropriate tool to fasten the mounting screws or bolts Po...

Страница 2: ...e You Start Find a suitable area in your warehouse or workshop where both halves of the Virtuo test fixture can be installed close to one another Ensure that the wall or other structure onto which you...

Страница 3: ...screws not provided in the indicated mounting holes 2 The Virtuo Touchscreen fastens to the monitor bracket using seven 7 locking hex nuts provided Note An alignment guide is included on the bottom pa...

Страница 4: ...nd fasten the Video Serial and Power cables to the back of the Virtuo monitor Assembling the Rest of the Virtuo Test Station 1 Mount the main bracket to your wall or mounting structure using four 4 ap...

Страница 5: ...xture Installation Guide Assembling the Rest of the Virtuo Test Station 2 Fasten the power supply computer amplifier I O board and ID chip to the main bracket using eighteen 18 locking hex nuts provid...

Страница 6: ...below Note Refer to the full Virtuo connection diagram also provided with your kit if needed 2 Use tie wraps provided to bundle cables together for a tidier test station and to make it easier to acce...

Страница 7: ...al 4 If the screen remains black while the computer still appears to be functional press the red PWR button on the I O board in order to bring the Virtuo test station out of standby mode You should no...

Отзывы:

Похожие инструкции для Virtuo Test Fixture