background image

Purpose

This document shows how to assemble and install the Virtuo Test Fixture 

(600201-001, -002 or -003)

Topics

Required Tools and Equipment

Included in This Kit

Installing the Monitor Bracket

Assembling the Rest of the Virtuo Test Station

Cables and Connections

Hard Drive

Powering Up

Contacting TouchTunes Technical Support

Required Tools and Equipment

• Hex ratchet, with M4 socket.
• Mounting screws or bolts (for mounting the fixture to a wall or other mounting structure)
• Appropriate tool to fasten the mounting screws or bolts.
• Power bar with power switch.

Audience

TouchTunes Virtuo Operators

TouchTunes field service and customer support

Estimated Time

30 minutes

Required Personnel

1 Technician

This document includes the following task types:

Software

Electrical

Mechanical

Packaging


Virtuo Test Fixture

Installation Guide

January 2016
900855-001
Rev 01

Содержание Virtuo Test Fixture

Страница 1: ...quired Tools and Equipment Hex ratchet with M4 socket Mounting screws or bolts for mounting the fixture to a wall or other mounting structure Appropriate tool to fasten the mounting screws or bolts Po...

Страница 2: ...e You Start Find a suitable area in your warehouse or workshop where both halves of the Virtuo test fixture can be installed close to one another Ensure that the wall or other structure onto which you...

Страница 3: ...screws not provided in the indicated mounting holes 2 The Virtuo Touchscreen fastens to the monitor bracket using seven 7 locking hex nuts provided Note An alignment guide is included on the bottom pa...

Страница 4: ...nd fasten the Video Serial and Power cables to the back of the Virtuo monitor Assembling the Rest of the Virtuo Test Station 1 Mount the main bracket to your wall or mounting structure using four 4 ap...

Страница 5: ...xture Installation Guide Assembling the Rest of the Virtuo Test Station 2 Fasten the power supply computer amplifier I O board and ID chip to the main bracket using eighteen 18 locking hex nuts provid...

Страница 6: ...below Note Refer to the full Virtuo connection diagram also provided with your kit if needed 2 Use tie wraps provided to bundle cables together for a tidier test station and to make it easier to acce...

Страница 7: ...al 4 If the screen remains black while the computer still appears to be functional press the red PWR button on the I O board in order to bring the Virtuo test station out of standby mode You should no...

Отзывы: