4
ENGLISH
INSTALLATION PROCEDURE
NOTE: T
HOUROUGHLY
CLEAN
AND
REMOVE
ALL
DEBRI
FROM
THE
WATER
SUPPLY
PIPE
BEFORE
INSTALLATION
. T
HIS
WILL
PREVENT
CLOGGING
THE
SPRAY
OUTLET
.
S
LIDE
ESCUTCHEON
ONTO
SHOWER
ARM
W
RAP
ADEQUATE
AMOUNT
OF
PIPE
TAPE
AROUND
THE
SHOWER
ARM
THREADS
.
T
HREAD
THE
SHOWER
ARM
INTO
SUPPLY
ELBOW
C
HECK
TO
MAKE
SURE
THAT
THE
FLOW
REGULATING
CHECK
VALVE
IS
INSTALLED
T
HREAD
THE
SHOWERHEAD
ASSEMBLY
ONTO
THE
SHOWER
ARM
UNTIL
TIGHT
S
LIDE
ESCUTCHEON
BACK
UP
AGAINST
THE
WALL
Shower Arm
Showerhead
assembly
Flow regulating
check valve
Escutcheon
Pipe Tape
Содержание Trilogy TS100A
Страница 5: ...5 ENGLISH ROUGH IN NPT 1 2 4 100mm 6 13 16 173mm 4 1 4 108mm 9 5 8 244mm C L TS100A 32...
Страница 12: ...12 ESPA OL BOSQUEJO NPT 1 2 4 100mm 6 13 16 173mm 4 1 4 108mm 9 5 8 244mm C L 32 TS100A...
Страница 19: ...19 FRAN AIS ROBINETTERIE BRUTE NPT 1 2 4 100mm 6 13 16 173mm 4 1 4 108mm 9 5 8 244mm C L 32 TS100A...
Страница 23: ...23...