background image

Installation Guide

To service installers

Please explain the FLOTATION TUB functions and operation to the customers.

Keep the power turned off when there is time until handing over the product in a new home.

FLOTATION TUB

PJYD2200

 

Ɣ

Cautions and warnings 

 

 2

 

Ɣ

Included parts 

 

 4

 

Ɣ

Required tools 

 

 5

 

Ɣ6SHFL¿FDWLRQV

 

 6

 

Ɣ

Dimension drawings 

 

 7

 

Ɣ

Electrical construction 

 

 8

 

Ɣ

Installation procedures 

 

 9

 

Ɣ

Meaning of the indications 

 

 10

 

Ɣ

Building a base for the bathtub 

 

 10

 

Ɣ

Installing the bathtub 

 

 11

 

Ɣ

Conduct a trial run 

 

 14

 

Ɣ

Finishing 

 

 15

Содержание PJYD2200

Страница 1: ...is time until handing over the product in a new home FLOTATION TUB PJYD2200 Cautions and warnings 2 Included parts 4 Required tools 5 6SHFL FDWLRQV 6 Dimension drawings 7 Electrical construction 8 In...

Страница 2: ...lation guide for installation QFRPSOHWH LQVWDOODWLRQ FDQ UHVXOW LQ D UH RU HOHFWULF VKRFN 2WKHUZLVH WKHUH LV D FKDQFH RI OHDNDJH WKDW could wet and cause damage to household property Make sure to foll...

Страница 3: ...or leakage that could wet and cause damage to household property Keep sources of heat at a distance Do not smoke Doing so could cause damage Do not install the bathtub outdoors or in a location that i...

Страница 4: ...2 A 3 A 4 A 5 A 6 A 7 A 8 Bathtub Polyethylene foamed sheet Instruction manual Cleaning spatula for NECK BATH DWKWXE LQJ SODWH VHW Installation guide Hand over A 3 5 to the customer after the constru...

Страница 5: ...B 3 B 4 B 5 B 6 B 7 M12 M10 B 8 B 9 B 15 B 17 B 18 B 16 B 10 B 11 B 12 B 13 B 14 B 1 B 19 PP H05VVF 3 x 1 5 mm2 a PP AWG8 PVC adhesive Silicone Soft cloth that will not damage the bathtub Water detect...

Страница 6: ...intake parts 1 location Number of water outlets 1 location DWHU GLVFKDUJH RZ UDWH Approx 18 L min HYDROHANDS Circulation Number of intake parts 1 location Number of water outlets 2 locations DWHU GLVF...

Страница 7: ...7 Dimension drawings Q FDVH RI DWWDFKLQJ DQ RSWLRQ RRU VWDQGLQJ EDWKWXE OOHU For an optional water faucet ask the dealer contractor from whom you purchased the product or TOTO...

Страница 8: ...magnetic thermal switch and ground fault circuit interrupter GFCI Install both switches outside of the bathroom 8VH D HG FRQQHFWLRQ WR VXSSO SRZHU WR WKH EDWKWXE Do not extend or relay the power cord...

Страница 9: ...9 Installation procedures 1 2 3 P 10 P 11 4 5 6 P 12 P 13 7 8 9 P 14 10 11 12 P 15...

Страница 10: ...be checked QGLFDWHV WKH ZRUN RZ Building a base for the bathtub B 11 B 8 B 6 B 7 1 a PP Waterproof Tile a PP Please conduct site operation directly on the drain When embedding a power cable for the b...

Страница 11: ...11 Installing the bathtub 2 1 B 14 2 Lift up Lift up 3 Cardboard box etc for packaging the bathtub B 17 B 18 B 2 Other Choices 4 1 2...

Страница 12: ...12 A 8 B 11 4 5 Power supply Brown Blue Green Yellow 3 B 2 IPX5 6 B 4 M12 5 1 5mm A 2 2 5mm...

Страница 13: ...B 15 B 6 B 1 B 12 1 2 3 4 5 6 6 A 40mm A 40mm WARNING Check to see that the hole positions are not overlapping with the cavity portions of the tile base If there are cavities use an adhesive anchor t...

Страница 14: ...cessing The controller does not light up or operate any functions Is power being supplied Has there been a power outage Is it locked Unlock by pressing and holding for over 3 seconds HYDROHANDS NECK B...

Страница 15: ...VH WKH EDWKWXE ZLWK D LQJ SODWH The bathtub may shake if it is not properly stabilised Finishing B 13 12 WARNING 6HFXUH HQRXJK VSDFH EHWZHHQ WKH EDWKWXE DQG WLOHV DQG OO WKDW VSDFH ZLWK VLOLFRQH that...

Страница 16: ...TOTO Ltd All rights reserved 2017 11 Printed in China NTE183...

Отзывы: