1. During the whole installation soft material is recommend to cover bathtub surface to
prevent surface scratching.
2. Ensure that surrounding edges of bathtub not supply upward supporting force.
3. During installation bathtub is forbidden to collide with hard material and hard material
not falling into bathtub.
4. The back of bathtub can not be filled or buried by mortar otherwise damage may be
caused.
5. Never make construction by standing on bathtub or place heavy material on the edge
of bathtub otherwise damage may be caused.
Warning
Warning
2. Adjust leveling of bathtub with adjustable wrench.
①.
Screw off the nut A;
Screw off
Screw off
②
.Adjust the nut B to the required position.
③
.Fasten the nut A.
Fasten
Fasten
The adjusting method for supporting foot:
N
ut A
N
ut B
3. Coat all -purpose adhesive onto marked ground with Φ30mm for each place.
* Note: After installation of bathtub is completed, firstly clean floor, then clean bathtub with rag dipped in
neutral detergent in order to keep cleaning and beauty of bathtub.