FRON
T
BAC
K
47cm
44cm
5-A
5-B
Instruction
manual
(This manual)
click
5-A
5-B
509
290
155
32
477
426
140
G1/2
G1/2
43 40
155
62
68 73 83
105
38 33
380 202
Strainer
Junction unit
ECO WASHER main unit
Base plate
Precautions before installation
Specifications
Symbols and meanings
Installation procedure
Check parts
Required tools
1.Turn on water supplies to the product only after all other installation
work is completed.
2.The water supply pressure must be within a range of 0.05MPa (dynamic)
to 0.75MPa (static).
Make sure your water supply pressure is within that
range.
3.The water supply temperature must be within a range of 0 to 35ºC.
Make sure your water supply temperature is within that range.
4.Do not use water supply hoses or junction unit other than those
provided with the product.
*Since a water flow test is conducted on each product at the factory,
water may have remained inside the product. This water does not
indicate a problem with the product.
: Movement conducted by the installer.
: Visual confirmation required.
: Work flow direction.
1
1
2
2
3
3
4
4
Trial operation
5
5
6
6
7
7
8
8
9
9
1
1
2
2
9
9
8
8
4
4