STEP • 14
STEP • 15
09
© Sheds (Midlands) Limited 2021
www.totalsheds.co.uk
= Drill Points using
screws provided as shown
x2
4.0 x 70mm
Per Floor Section
x3
x4
4.0 x 70mm
APEX ROOF SECTIONS
FINISHING THE APEX
FOOR PANLES
(Ensure all panels are placed
so so that they are on top of
the panel of the same size.)
15b
14a.
Place the other roof
panels onto the Roof. The
upper and lower roof blocks
will slot in place as shown.
The top roof block will
naturally hang off the
Gable Ends & Truss peaks
when placed correctly.
14b.
Screw the roof panel
in place against lower
panel and relative trusses.
Per Overhang
TACKS PROVIDED
ATTACH THE ROOF FELT
Use the felt lengths
provided.
15a.
Apply the roof felt as shown.
Apply lower levels first to create correct rain run off
positions.
15b.
Using a hammer, tack down the felt with the tacks provided in a
neat fashion.
15c.
Trim down excess felt with a stanley knife.
Remember to overlay the 1st felt to avoid rain leaks.
15d.
Tuck and fold edges neatly and tack in place to
hide any loose edges. Check that all areas are covered
and there are no holes to avoid any rain water
getting through your felt roof.
ROOF FELT
3rd