DISASSEMBLY INSTRUCTIONS
B3-2
Lever Switch
Fig. 3-4-C
Rack Loading
A
B
The Lever should be position
between A and B.
3-5:
Remove the Traverse Holder.
Remove the 2 Insulator (F).
1.
2.
Fig. 3-5-A
Traverse Holder
TRAVERSE HOLDER/INSULATOR (F)
(Refer to Fig. 3-5-A)
Insulator (F)
(Black)
Main Chassis Ass'y
NOTE
1. After the installing of the Traverse Holder, check if the
wire is like Fig. 3-5-B.
Insulator (F)
(Black)
Fig. 3-4-D
Fig. 3-5-B
Traverse Holder
Main Chassis Ass'y
NOTE
1.
2.
3.
4.
When installing the Clamper Magnet, install it with the
green face up.
When installing the wire of the Lever Switch, install it
correctly as Fig. 3-4-B.
When installing the Lever Switch, install it correctly as
Fig. 3-4-C.
In case of the Lever Switch installation, hook the wire
on the Main Frame as shown Fig. 3-4-D.
Fig. 3-4-B
Lever Switch
Red
White
Blue
From DVD PCB
3-7: RACK FEED ASS'Y (Refer to Fig. 3-7-A)
Remove the screw
1
.
Remove the Rack Feed 1/2 Spring, Rack Feed 1/2 and
Rack Feed Lever.
1.
2.
1
Rack Feed 1
Rack Feed Lever
Rack Feed 2
Rack Feed 1 Spring
Rack Feed 2 Spring
Fig. 3-7-A
Main Chassis Ass'y
• Screw Torque: 3.5
±
0.5kgf•cm
3-6: SWITCH PCB ASS'Y (Refer to Fig. 3-6-A)
Remove the screw
1
.
Remove the Switch PCB Ass'y.
1.
2.
Fig. 3-6-A
Switch PCB Ass'y
1
Main Chassis Ass'y
• Screw Torque: 4
±
0.5kgf•cm
NOTE
1. When installing the wire of the Switch PCB, install it
correctly as Fig. 3-6-B.
Fig. 3-6-B
Switch PCB Ass'y
Black
White
From Relay PCB