No.
Part name
Procedures
Remarks
7
Compressor
1)
Perform work of item 1 of
1
and
2
,
3
,
4
,
5
.
2) Extract refrigerant gas.
3) Remove the partition board.
(ST2TØ4 × 10L 3 pcs.)
4) Remove the sound-insulation material.
5) Remove terminal cover of the compressor, and
disconnect lead wire of the compressor from
the terminal.
6) Remove pipe connected to the compressor with
a burner.
7) Remove the fixing screw of the bottom plate
and heat exchanger. (ST2TØ4 × 10L 1 pc.)
8) Remove the fixing screw of the bottom plate
and valve fixing plate.
(ST2TØ4 × 10L 1 pc.)
9) Pull upward the refrigeration cycle.
Compressor
10) Remove NUT (3 pcs. fixing the compressor to
the bottom plate.
8
Electronic expansion
valve coil
Fan Guard
1.
Detachment
1)
Perform work of item 1 of
2
.
2)
Remove the front cabinet, and put it down
so that fan guard side directs downward.
Perform work on a corrugated cardboard,
cloth, etc. to prevent fl aw to the product.
3) Remove the hooking claws by pushing
minus screwdriver according to the arrow
mark in the right figure, and remove the fan
guard.
2. Attachment
1) Insert claws of the fan guard in the holes of
the front cabinet.
Push the hooking claws (9 positions) by
hands and fix the claws.
All the attaching works have completed.
Check that all the hooking claws are fi xed
to the specifi ed positions.
Minus screwdriver
Hooking claw
9
BODY-PMV
COIL-PMV
Rotate 180°
1.
Detachment
1) Perform step 1 in 1 , all the steps in 2 and
1 in 5 .
2) Turn the coil by 180 degrees then remove
by pull it upward.
2.
Attachment
1) Insert the coil at position which
perpendicular with pipe of PMV then turn
the coil by 180 degrees.
Make sure that lead wire of coil
is opposite with pipe of PMV
- 123 -