![Toshiba RAS-16SAV-A Скачать руководство пользователя страница 39](http://html.mh-extra.com/html/toshiba/ras-16sav-a/ras-16sav-a_service-manual_1134834039.webp)
– 39 –
Item
Operation flow and applicable data, etc.
Description
7. Defrost control
(Only in heating
operation)
(This function removes frost adhered to the outdoor
heat exchanger.)
The temperature sensor of the outdoor heat ex-
changer (Te sensor) judges the frosting status of the
outdoor heat exchanger and the defrost operation is
performed with 4-way valve reverse defrost system.
The necessity of defrost operation is
detected by the outdoor heat exchanger
temperature. The conditions to detect the
necessity of defrost operation differ in A,
B, or C zone each. (Table 1)
<Defrost operation>
• Defrost operation in A to C zones
1) Stop operation of the compressor for
20 seconds.
2) Invert (ON) 4-way valve 10 seconds
after stop of the compressor.
3) The outdoor fan stops at the same time
when the compressor stops.
4) When temperature of the indoor heat
exchanger becomes 38°C or lower,
stop the indoor fan.
<Finish of defrost operation>
• Returning conditions from defrost
operation to heating operation
1) Temperature of outdoor heat exchanger
rises to +8°C or higher.
2) Temperature of outdoor heat exchanger
is kept at +5°C or higher for 80 seconds.
3) Defrost operation continues for
15 minutes.
<Returning from defrost operation>
1) Stop operation of the compressor for
approx. 50 seconds.
2) Invert (OFF) 4-way valve approx. 40
seconds after stop of the compressor.
3) The outdoor fan starts rotating at the
same time when the compressor starts.
Table 1
* The minimum value of Te sensor 10 to 15 minutes
after start of operation is stored in memory as Te0.
–5˚C
0’
10’ 15’
27’40”
34’
–7˚C
–20˚C
Operation time
(Minute)
Start of heating operation
*
Outdoor heat e
xchanger temper
ature
C zone
A zone
B zone
A zone
B zone
C zone
When Te0 - TE
≥
2.5 continued for 2 minutes in A zone,
defrost operation starts.
When the operation continued for 2 minutes in B zone,
defrost operation starts.
When Te0 - TE
≥
3 continued for 2 minutes in C zone,
defrost operation starts.
Содержание RAS-16SAV-A
Страница 18: ... 18 5 WIRING DIAGRAM 5 1 RAS 13SKV E RAS 13SAV E RAS 10SKVR E RAS 10SAVR E RAS 13SKVR E RAS 13SAVR E ...
Страница 19: ...5 2 RAS 16SKV E RAS 16SAV E RAS 16SKVR E RAS 16SAVR E 19 ...
Страница 105: ... 105 R05 L01 C01 CN23 FUSE R04 R01 CN10 J04 IC03 C20 IC01 T01 C03 DB01 RAS 16 Series ...