P9 ASD Installation and Operation Manual
11
Power Factor Correction
DO NOT
connect a power factor correction capacitor or surge absorber to the output of the
P9 ASD
.
If the P9 ASD is used with a motor that is equipped with a capacitor for power factor correction, remove
the capacitor from the motor.
Connecting either of these devices to the output of the P9 ASD may cause the P9 ASD to malfunction
and trip, or the output device may cause an over-current condition resulting in damage to the device or
the P9 ASD.
Light Load Conditions
When a motor is operated under a continuous light load (i.e., at a load of less than 50% of its rated
capacity) or it drives a load which produces a very small amount of inertia, it may become unstable and
produce abnormal vibration or trips because of an over-current condition. In such a case, the carrier
frequency may be lowered to compensate for this undesirable condition (see
Program
Special
Carrier Frequency
).
Note:
When operating in the
Vector Control
mode, the carrier frequency should be set to
2.2 kHz or above.
Motor/Load Combinations
When the
P9 ASD
is used in combination with one of the following motors or loads, it may result in
unstable operation.
•
A motor with a rated capacity that exceeds the motor capacity recommended for the P9 ASD.
•
An explosion-proof motor.
When using the P9 ASD with an explosion-proof motor or other special motor types, lower the carrier
frequency to stabilize the operation, but
DO NOT
set the carrier frequency below 2.2 kHz if operating the
system in the vector control mode.
Note:
When operating in the
Vector Control
mode, the carrier frequency should be set to
2.2 kHz or above.
If the motor being used is coupled to a load that has a large backlash or if coupled to a reciprocating load,
use one of the following procedures to stabilize motor operation.
•
Adjust the
S-pattern
acceleration/deceleration setting,
•
If operating in the
Vector
control mode, adjust the response time, or
•
Switch to the
Constant Torque
control mode.
Содержание P9
Страница 1: ...TM P9 ASD Install Op Manual TOSHIBA P9 ASD INSTALLATION OPERATION MANUAL DN 64054 004 February 2013 ...
Страница 2: ......
Страница 3: ...Document Number 64054 004 February 2013 P9 ASD Installation Operation Manual TM ...
Страница 4: ......
Страница 280: ...270 P9 ASD Installation and Operation Manual Figure 38 See Tables 17 and 18 for Actual Dimensions ...
Страница 281: ...P9 ASD Installation and Operation Manual 271 Figure 39 See Tables 17 and 18 for Actual Dimensions ...
Страница 282: ...272 P9 ASD Installation and Operation Manual Figure 40 See Tables 17 and 18 for Actual Dimensions ...
Страница 285: ...P9 ASD Installation and Operation Manual 275 Figure 43 See Table 18 for the associated device Dimensions are in in cm ...
Страница 304: ...294 P9 ASD Installation and Operation Manual W W T3 16 Warranty Card 2 W Phase Over Current 265 ...