Installation Manual June, 2011
2-1
Chapter 2 – IP
edge
Hardware
POWER REQUIREMENTS
Toshiba recommends an uninterruptible power supply (UPS) for the
IP
edge
server. A UPS is the preferred power source since it provides
automatic switch-over to 120 VAC back-up in case of a loss of power. The
specific input voltage and current requirements for each server is listed
the specifications for each model.
IP
edge
SERVERS
The IP
edge
hardware platform is available in two configurations. The
IP
edge
EC serving up to 200 users and the IP
edge
EM serving up to
1000 users. The servers are both 1U rackmount chassis. Refer to
Figure 2-1 IP
edge
Server Hardware - Front View
EC SERVER
For IP
edge
systems of up to 200 users. This server has one, front access
2.5 inch hard disk drive. Refer to
.
The IP
edge
EC server supports IPMI (Intelligent Platform Management
Interface) 2.0.
Dimensions
•
Height 1.7" (43 mm) 1U
•
Width 17.2" (437 mm) Fits a standard 19 inch rackmount
•
Depth 15" (381 mm)
•
Gross Weight 15.4 lbs (7 kg)
Environmental
Specifications
•
Operating Temperature: 10° to 35°C (32° to 95°F)
•
Storage Temperature: -20° to 60°C (-4° to 140°F)
EC Server - Up to 200 users
EM Server - Up to 1000 users
Содержание IPedge
Страница 1: ...TOSHIBA Telecommunication Systems Division Installation Manual Title Page June 2011 ...
Страница 18: ...This page is intentionally left blank ...
Страница 32: ...This page is intentionally left blank ...
Страница 46: ...This page is intentionally left blank ...
Страница 74: ...This page is intentionally left blank ...
Страница 78: ...This page is intentionally left blank ...
Страница 88: ...This page is intentionally left blank ...
Страница 92: ...This page is intentionally left blank ...
Страница 96: ...This page is intentionally left blank ...
Страница 140: ...MEDIANT 1000 CONFIGURATION IPedge Configuration 12 20 Installation Manual June 2011 ...
Страница 165: ...Server Based Call Manager Configuration Assign Users to User Groups Installation Manual June 2011 13 25 ...
Страница 187: ...EM SERVER FAN REPLACEMENT Power UP Server Installation Manual June 2011 15 11 Figure 15 2 EM Server Fan Location ...
Страница 196: ...THIS IS THE END OF THE DOCUMENT ...