3 4400 80kVA Seismic Installation
Table 3 lists the contents of the 4400 80kVA Seismic Kit 4400800SEISMICKIT.
shows the order
of assembly for the [bolt + lock washer] fastener group.
TABLE 3 80 KVA SEISMIC KIT CONTENTS
440800SEISMICKIT Contents
No.
P/N*
Description
Quan
5
66437 TOP SEISMIC BRACKET
1
7-a
–
Hex Bolt, 1/4—20,1-1/2”
2
7-b
–
Flat Washer, 1/4
2
7-c
–
E—Ring, F/0.25 Shaft
2
11-a
–
Hex Bolt, 5/16—18 x 1”
4
11-b
–
Lock Washer, 5/16
4
11-c
–
Flat Washer, 5/16
4
–
94016 4400 Seismic Kit Installation Manual
1
80 kVA
1. Prepare the floor anchorages. Arrange the anchorages to ac-
commodate the final layout including placement for ancillary
battery and/or Auxiliary cabinets. (
2. Prepare the wall anchorages. Key measurements off the an-
chorage placement in Step 1. (
)
3. Table 3 lists the components of the 80kVA Seismic Kit.
show the Seismic anchorage component in the Seismic Kit
for the 80kVA cabinets.
4. Assemble the fastener groups in Table 3, [7a-7c] and
[11a-11c] as shown in
5. Secure the Top Seismic Bracket [5] to the top rear of the UPS
using three (3) fastener group [11]. (
)
6. Position the 80 kVA cabinet over the four floor anchors and se-
cure the unit.
7. Secure the Top Seismic Bracket to the wall anchors using 5/16”
Bolts.
8. Once installation is complete, secure the door of the cabinet us-
ing the two (2) Fastener Group [7]. (
a
b
c
FIgUrE 3.1: FASTENEr
grOUP (BOLT +LOCK
WASHEr)
P/N 440800SEISMICKIT
80 kVA
5
7
FIgUrE 3.2: SEISMIC KIT