
Replacing the PTO Drive Belt
Service Interval:
Every 50 hours
1. Disengage the PTO, move the motion control levers
to the neutral locked position and set the parking
brake.
2. Stop the engine, remove the key, and wait for all
moving parts to stop before leaving the operating
position.
3. Loosen the front engine panel knobs and remove
the panel (Figure 67).
Figure 67
1.
Knob
2.
Front engine panel
4. Remove the spring from the idler arm (Figure 68).
5. Remove the clutch stop bracket.
6. Remove the old PTO drive belt.
7. Install the PTO drive belt around the clutch pulley
and the gearbox pulley (Figure 68).
8. Intall the rubber clutch stop.
9. Install the spring to the idler arm (Figure 68).
Figure 68
1.
Gear box
4.
Clutch
2.
Spring
5.
Rubber clutch stop
3.
Spring loaded idler pulley
6.
PTO Drive belt
Replacing the Pump Drive Belt
Service Interval:
Every 50 hours
Note:
Remove the PTO drive belt first if the pump
drive belt needs to be replaced.
1. Tilt the seat forward and remove the front engine
panel.
2. Remove the PTO drive belt.
3. Remove the spring from the idler arm (Figure 69).
4. Install the new belt around the engine and hydro
pump pulley (Figure 69).
5. Install the PTO drive belt.
6. Install the spring to the idler arm (Figure 69).
Figure 69
1.
Clutch
3.
Spring
2.
Pump drive belt
4.
Spring loaded idler pulley
48
Содержание Z580-D Z Master 74266CP
Страница 6: ...Slope Chart 6 ...
Страница 8: ...98 5954 105 7798 107 1613 107 1857 107 1860 107 1861 107 1864 8 ...
Страница 9: ...107 2102 107 2112 107 2114 104 2449 108 5955 108 5957 108 5981 9 ...
Страница 64: ...Schematics Wire Diagram Rev A 64 ...
Страница 65: ...Notes 65 ...
Страница 66: ...Notes 66 ...