Installation
5
8.
Install the ilder pulley on the 3/8–16 x 2” (51
mm) bolt so that the extended hub of the pulley
is toward the tiller lift frame. Route the belt
under the idler pulley, and insert the bolt through
the upper belt guard hole and upper hole in the
tiller lift frame
(Fig. 4). Tighten the nut securely.
m–4422
1
4
5
4
6
2
7
8
3
Figure 4
1.
Belt cover
2.
Gearcase bolt
3.
Input pulley
4.
Locknut, 3/8”
5.
Bolt, 3/8–16 x 2” (51 mm)
6.
Upper hole
7.
Tiller Belt (short belt)
8.
Idler pulley
9.
Torque the nut on the gearcase (upper end of belt
guard) to 30–32 ft–lbs.
Tractor Set-Up
Installing the Rear Attach–A–Matic
to
the Tractor
Follow the installation instructions that come with the
rear Attach–A–Matic
mount.
Installing the Front Pulley Box to the
Tractor
1.
Attach the pulley box that came with the tiller to
the front Attach–A–Matic
.
IMPORTANT: The pulley box for the tiller
and cutter deck are different. Make certain
to always use the tiller pulley box with the
tiller.
2.
Make sure the latches on the tractor’s front
Attach–A–Matic
are open (Fig. 5). Then slide
the pulley box into the Attach–A–Matic
latches and seat it. Close the latches.
m–3642
1
2
2
3
4
5
6
7
Figure 5
1.
Attach–A–Matic
latches
2.
Pulley box
3.
Idler pulley
4.
Belt tension release arm
5.
Belt tension adjustment
knob
6.
Belt tension indicators
(one on each side)
7.
Attach–A–Matic
release
button (one on each side)
Remove the drawbar hitch
1.
Remove the snap ring from the pin and slide
from the drawbar and spacers. Remove the hitch
from the tractor (Fig. 6).
Note:
Save all hardware for use when
re-installing the hitch.