Setup
Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure
Description
Qty.
Use
1
No parts required
–
Unfold the handle.
Bolt (1/4–20 X 1–1/2 inches)
1
Locknut (1/4–20 inch)
1
Carriage bolt (1/4–20 x 1 inch)
3
Locknut (1/4–20 inch)
3
2
Screw (1/4–20 X 5/8 inch)
1
Install the discharge chute.
3
No parts required
–
Check the engine-oil level.
1
Unfolding the Handle
No Parts Required
Procedure
Important:
Ensure that the cables are not pinched
when unfolding the handle.
Figure 4
5