![Toro ProLine 30167 Скачать руководство пользователя страница 14](http://html1.mh-extra.com/html/toro/proline-30167/proline-30167_operators-manual_1131986014.webp)
10
Set-up
Loose Parts
Note:
Use the chart below to verify all parts have been shipped.
DESCRIPTION
QTY.
USE
Upper Handle
Flanged bolt 3/8–16 x 1” (26 mm)
Flange nut 3/8–16
1
4
4
Install upper handle to frame
Shift lever
Shift lever mounting bracket
Washer 1/4”
Bolt 1/4–28 x 2” (51 mm)
1
1
1
1
Install shift lever to transmission
Rod fitting
Clevis pin
Washer 1/4”
Hairpin cotter
2
2
2
2
Install control rods
Fuel tank
Control panel
Bolt 5/16–1/ x 7/8” (22.5 mm)
Lock washer 5/16”
Washer 5/16”
Hose clamp
1
1
4
4
4
2
Install fuel tank and control panel
Screw (self-tapping)
Star washer
Wire tie
1
1
2
Connect wire harness
Operator’s Manual
Engine Operator’s Manual
Parts catalog
Registration card
1
1
1
1
Read before operating machine
Fill out and return to Toro
Содержание ProLine 30167
Страница 9: ...Safety 5 Slope Chart Read all safety instructions on pages 2 7 ...
Страница 10: ...6 ...
Страница 36: ...Maintenance 32 Wiring Diagram ...
Страница 40: ......
Страница 41: ......