
9
SETTING UP WATERING PROGRAMS
To program
Watering Days
:
1
Select
SET WATERING DAYS
on the
Control Dial
.
One of three screens will appear. On the first screen,
one of the days of the week will be flashing. On the second screen,
ODD
may be replaced by
EVEN
. On
the third screen, INTERVAL DAYS is displayed.
2
Press until
PROG No
indicates the desired program (1, 2, 3, 4, 5 or 6).
3
Press or to move to the appropriate screen.
a. To select specific
Watering Days
, press until
MON
is flashing. Press if watering is required
on Monday, or press if it is not. Repeat for each of the other days of the week. When a day has
been deselected, it will no longer be displayed. Only those days when watering is to occur will be
displayed.
b. To select
ODD
or
EVEN
, press or until the desired
ODD
or
EVEN
is displayed.
c. To select a watering Interval, press until the number of
INTERVAL DAYS
is flashing. Press
or until the desired number is displayed. The interval may be any number of days from 1 to 15.
Then press , the lefthand number will flash. Press or to change this number to reflect
the current day in the cycle. For example if set to 0 with a 4 day interval, the next irrigation would
occur in 3 days. If set to 2 in a 3 day interval the next irrigation would occur a day later.
4
Repeat steps 2 and 3 until
Watering Days
have been programmed for all
Programs
.
MON
WED
FRI
SUN
1
No
PROG
PROG
No
1
ODD
DAYS
PROG
No
1
INTERVAL DAYS
3
0
WATER
No