11
Installing the Attachment
Parts needed for this procedure:
1
Attachment (ordered separately; refer to your
authorized Toro distributor)
2
Bolt (5/16 x 2 inches)
2
Nut (5/16 inch)
Procedure
Install the front attachment (e.g., cutting unit, plow
blade, or blower); perform the following steps and
refer to your attachment
Operator’s Manual
for
additional installation instructions.
1.
Have an assistant sit in the seat, turn the key
to the O
N
position, and use the attachment lift
switch to lower the lift arms while you push down
on the lift arms.
2.
Align the lift-arm holes with the attachment-arm
holes per the attachment
Installation Instructions
.
3.
When you install the PTO shaft to the gearbox,
assemble each pair of bolts (5/16 x 2 inches)
and nuts (5/16 inch) opposite each other (
) and torque the nuts to 40 N∙m (30 ft-lb).
g299646
Figure 15
1.
Gearbox
3.
Bolts and nuts
2.
PTO shaft
12
Checking the Fluid Levels
No Parts Required
Procedure
Before you start the engine for the first time, perform
the following fluid-level checks:
•
Check the engine-oil level; refer to
Engine-Oil Level (page 44)
.
•
Check the coolant level; refer to
Cooling System and Coolant Level (page 52)
.
•
Check the hydraulic-fluid level; refer to
the Hydraulic-Fluid Level (page 58)
.
13
Checking the Tire Pressure
No Parts Required
Procedure
Check the tire pressure; refer to
.
Important:
Maintain pressure in all tires to
ensure a good quality-of-cut and proper machine
performance. Do not underinflate the tires.
14
Installing the CE Kit
Parts needed for this procedure:
1
CE Kit (ordered separately; refer to your authorized
Toro distributor)
Procedure
If you operate the machine in a country that complies
to CE standards, install the CE Kit; refer to the kit
Installation Instructions
.
17
Содержание Groundsmaster 3300 Series
Страница 22: ...Specifications Note Specifications and design are subject to change without notice g302841 Figure 23 22...
Страница 63: ...Notes...
Страница 64: ...Notes...
Страница 65: ...Notes...