![Toro E-Z Vac 79346 Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/toro/e-z-vac-79346/e-z-vac-79346_operators-manual_1133477012.webp)
5
Installing the Pulley
Assembly, Belt Cover,
and Shoulder Bolt
Parts needed for this procedure:
1
Pulley assembly
1
Belt cover
Procedure
1.
Remove the nut and washer from the right
mower deck pulley.
2.
Install the pulley assembly to the right mower
deck pulley with the previously removed nut and
washer (
Important:
For 48-inch mower decks, use
the small blower pulley.
For 54-inch and 60-inch mower decks, use
the large blower pulley.
3.
Torque the nut to 136 to 149 N∙m (100 to 110
ft-lb).
g201880
Figure 11
54-inch mower deck shown
1.
Existing pulley nut
4.
Existing deck (spindle)
pulley
2.
Existing washer
5.
Spindle
3.
Blower pulley
4.
Install the new belt cover over the pulley
assembly using the 4 previously removed
screws (1/4 x 1/2 inch) as shown in
g201435
Figure 12
1.
Belt cover
2.
Screw (1/4 x 1/2 inch)
6
Installing the Attachment
Mount
Parts needed for this procedure:
1
Stabilizer bracket
2
Carriage bolt (5/16 x 3/4 inch)
4
Locknut (5/16 inch)
2
Self-tapping screw (5/16 x 3/4 inch)
2
Bolt (5/16 x 1 inch)
1
Pivot frame
2
Hairpin cotter
2
Rod
2
Washer
Procedure
1.
Remove the existing 2 bolts, 2 nuts, and hitch
bracket from the bottom of the engine guard
(
).
10