![Toro CCR Quick Clear 38563 Скачать руководство пользователя страница 20](http://html.mh-extra.com/html/toro/ccr-quick-clear-38563/ccr-quick-clear-38563_operators-manual_1134141020.webp)
Note:
Route the new drive belt first around the
engine pulley, then the idler pulley, and finally
around the loose rotor pulley positioned just
above the rotor shaft (
).
6.
Install the rotor pulley onto the rotor shaft (
7.
Install the curved washer and the rotor-pulley
bolt and tighten them securely (
Note:
The concave side of the curved washer
goes against the outside of the pulley.
8.
Install the brake spring onto the idler arm (
9.
Install the drive-belt cover with the bolts that you
removed in step
.
Note:
Ensure that the drive belt is properly
adjusted and operating; refer to
Control Cable (page 13)
and
Control Cable (page 14)
.
Adjusting the Quick Shoot
Control
If there is more than 13 mm (1/2 inch) of slack in the
Quick Shoot cable (
) or the discharge chute
does not rotate left and right in equal angles, adjust
the Quick Shoot control cables.
g006514
Figure 30
1.
13 mm (1/2 inch) maximum slack
1.
Loosen the 2 Quick Shoot control-cable clamps
(
).
g006406
Figure 31
1.
Cable clamps
2.
Position the Quick Shoot control between the
2 arrows located on the right side of the upper
handle (
g006405
Figure 32
1.
Arrows
3.
Rotate the discharge chute so that it faces
straight ahead and the arrow on the back of the
discharge chute aligns with the arrow on the
shroud (
).
18