4.
Lift the bagger top and install the bags by sliding
the bag frame hooks onto the retaining brackets
(
).
g033032
Figure 20
1.
Bag
3.
Retaining bracket
2.
Bagger frame
4.
Bag frame hook
5.
Lower the bagger top onto the bags (
g033030
Figure 21
6.
Secure the hood with the latch (
7.
Install the upper bagger tube by inserting the
curved end into the opening in the bagger top.
Note:
Ensure that the flared end with the
retention post is pointing down and forward in
preparation to be mated with the Finishing Kit.
6
Installing the Chute
Parts needed for this procedure:
1
Chute
1
Knob
1
Carriage bolt (5/16 x 1-3/8 inches)
1
Flange nut (5/16 inch)
Procedure
1.
Remove the plate assembly that includes the
side-discharge chute (
Note:
The baffle comes off at the same time.
Save this hardware and plate assembly.
g017826
Figure 22
1.
Flange nuts
3.
Carriage bolts
2.
Plate assembly with
discharge chute
4.
Existing baffle
12
Содержание 79398
Страница 20: ......