5
6
3
m–5934
4
2
5
1
Figure 8
1.
Center tunnel baffle
2.
Carriage Bolt, 5/16 x
5/8 in.
3.
Flange nut, 5/16 in.
4.
Flush edge with mounting
bracket
5.
Front tunnel baffle
6.
Rear hole in baffle
Installing the Cutting Chamber
Baffle
1. Place the cutting chamber baffle behind the right
cutting chamber and against the mower flange
(Fig. 11).
2. Install the cutting chamber baffle to the center baffle
and rear baffle with 1 button head socket bolt (5/16 x
3/4 in.) and 1 flange nut (5/16 in.) (Fig. 12).
3. Align the cutting chamber baffle so the baffle flange is
3–1/2 in. (89 mm) from the top of the cutting chamber
(Figures 9 and 10).
Important
Make sure the baffle flange is 3–1/2 in.
(89 mm) from the top of the cutting chamber and there is
blade clearance of 3/8 in.
±
1/16 in. (Figures 9 and 10).
4. Clamp the baffle in place.
1
5
4
3
2
m–6087
Figure 9
1.
Baffle flange
2.
Blade
3.
Spindle
4.
Blade clearance,
3/8 in.
±
1/16 in.
5.
Baffle to top of cutting
chamber, 3–1/2 in.
4
1
2
3
m–6082
Figure 10
1.
Baffle flange
2.
Blade
3.
Spindle
4.
Baffle to top of cutting
chamber, 3–1/2 in.
5. Using the baffle as a template, drill two, 11/32 in.
diameter, holes into the side of the cutting chamber
(Fig. 11).
6. Drill two, 9/32 in. diameter, holes into the bottom of
the mower flange (Fig. 11). The holes must be
centered on the mower flange.
7. Remove the clamp.
Содержание 78493
Страница 8: ...8...