Installation
4
Installing the Mower
1.
Slide mower under traction unit and remove
outer flange locknut from bolts, attach to chains
hanging from traction unit lift system (Fig. 1).
2.
Attach bolts to cross braces of mower with
previously removed 7/16” flange locknut on
each bolt (Fig. 1). Tighten flange locknuts
securely.
2
1
m-3684
3
2
3
Figure 1
1.
Chain from lift system
2.
Bolt 7/16–14 x 1-1/2”
(38 mm)
3.
Flange locknut 7/16–14
3.
Place struts between mower brackets and attach
to mower with pins.
4.
Secure pin flange to mower with 5/16–18 x 3/4”
(19 mm) bolt and 5/16–18 flange nut (Fig. 2).
1
m-3685
2
6
7
Figure 2
1.
Strut
2.
Pin
3.
Bolt 5/16–18 x 3/4”
(19 mm)
4.
Flange nut 5/16–18
Install PTO Belt
Refer to; Replacing PTO Belt page 13.