
1
2
3
G023353
Figure 6
Ball hitch shown
1.
Top position
3.
Bottom position
2.
Middle position
4.
Torque the 2 nuts and 2 bolts to 102 N-m (75 ft-lb).
Important:
Refer to the machine
Operator’s Manual
for
information about hitching and towing the machine.
3
Installing the Safety Chain and
Connecting Links
Parts needed for this procedure:
1
Safety chain
2
Connecting link
Installing the Safety Chain
1.
Form a hook on the end of a bendable piece of rod
or stiff wire (not included), and insert it through both
keyholes in the tow pole of the machine (Figure 7).
A
B
C
D
G023355
2
3
4
3
1
Figure 7
1.
Keyhole
3.
Safety chain
2.
Rod or wire (not included)
4.
Connecting link
2.
Attach the safety chain to the length of rod or wire
(Figure 7).
3.
Pull the rod, or wire, and the safety chain through both
keyholes (Figure 7).
Note:
Ensure that approximately equal lengths of
safety chain extend from either side of the tow pole.
4