Engine Installation (continued)
6. Install the rotor pulley onto the rotor shaft. Apply blue threadlocker to threads
of the new (1/4-20 x 7/8 inch) screw. Install the Belleville washer and screw
securing the rotor pulley assembly to the rotor shaft. Torque the screw to 11.3
± 1 N • m (100 ± 10 in-lb).
g324731
Figure 13
7. Hook the extension spring to the idler arm.
g324732
Figure 14
8. Install the belt cover to the auger housing. Install the 3 (1/4–20 x 5/8 inch)
screws securing the belt cover to the auger housing. Torque the screws to
4.5–6.8 N • m (40–60 in-lb).
9. Install the recoil handle to the rope guide.
10. Install the shroud onto the machine.
Shroud Installation (page 5–10)
11. Refill the fuel and oil.
Electric Starter Replacement
Electric Starter Removal
1. Remove the engine from the machine.
Engine Removal (page 4–4)
POWER CLEAR® 721/821 Snowthrower Service Manual
Page 4–9
Engine: Service and Repairs
3438-776 Rev A
Содержание 38754
Страница 6: ...Preface Page 6 POWER CLEAR 721 821 Snowthrower Service Manual 3438 776 Rev A ...
Страница 24: ...Troubleshooting General Troubleshooting Page 3 4 POWER CLEAR 721 821 Snowthrower Service Manual 3438 776 Rev A ...
Страница 46: ...Engine Service and Repairs Page 4 22 POWER CLEAR 721 821 Snowthrower Service Manual 3438 776 Rev A ...